Not everyone can hire expensive architects, the process of converting blueprint into the 3d model take lots of time and money. Still in the age of automation people converting blueprint into 3D model by manual, they converting each component into 3d model so we though why not automate this whole pro
CAD-iT (Automated 3D modeling)
Not everyone can hire expensive architects, the process of converting blueprint into the 3d model take lots of time and money. Still in the age of automation people converting blueprint into 3D model by manual, they converting each component into 3d model so we though why not automate this whole process?
Therefore, the plan for the software is below.
Synchronize Customer projects, 3D Model and their detail on the Cloud Server.
Project will be implemented in iterative way. This implementation steps can be repeatable.
Implementation method phases are below.
Planning & Requirements:
As with most any development project, the first step is go through an initial planning stage to map out the specification documents, establish software requirements, and prepare for the upcoming stages of the cycle.
Analysis & Design:
Once planning is complete, an analysis is performed to nail down the appropriate business logic, database models, and the like that will be required at this stage in the project. The design stage also occurs here, establishing any technical requirements (languages, data layers, services, etc.) that will be utilized in order to meet the needs of the analysis stage.
Implementation:
With the planning and analysis out of the way, the actual implementation and coding process can now begin. All planning, specification, and design docs up to this point are coded and implemented into this initial iteration of the project.
Testing:
Once this current build iteration has been coded and implemented, the next step is to go through a series of testing procedures to identify and locate any potential bugs or issues that have cropped up.
Evaluation:
Once all prior stages have been completed, it is time for a thorough evaluation of development up to this stage
Follow-up phase:
Now the most recently built iteration of the software, as well as all feedback from the evaluation process, is brought back to the planning, development stage at the top of the list, and the process repeats itself all over again.
Project Final technical deliverable are list below.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| VPS/Cloud | Equipment | 1 | 12000 | 12000 |
| Domain Hosting | Equipment | 1 | 5000 | 5000 |
| Graphic Card Gtx 1660Ti(will used in Development & 3D Model rendering) | Equipment | 1 | 51000 | 51000 |
| Sketching of UI, BluePrints, all kind of Report printing & more | Miscellaneous | 1 | 6000 | 6000 |
| Total in (Rs) | 74000 |
Color blindness is the lack of visioning the colors. It is the deficiency that in which th...
The basic purpose of this project is to upholds the different forestry task by the special...
?This application is basically for those non-brands which are not popular but are very wor...
Among the major sources of energy supply systems, hydroelectric power plants are the most...
This project consists of an Andriod Application which will manage the expenses of a user&n...