Adil Khan 9 months ago
AdiKhanOfficial #FYP Ideas

Automatic Train System

In automatic train management system all management are automatically controlled. Like Speed, stop/resume and arrival at station in fixed time. The gateways, track maintenance traffic controls, lighting system are also automatically controlled.  

Project Title

Automatic Train System

Project Area of Specialization

Artificial Intelligence

Project Summary

In automatic train management system all management are automatically controlled. Like Speed, stop/resume and arrival at station in fixed time. The gateways, track maintenance traffic controls, lighting system are also automatically controlled.
 

Project Objectives

  •  Avoid accidents
  • Time management  
  • All systems are automatically controlled
  •  Website and Online ticketing system 
  • Aknowledge through SMS or email

Project Implementation Method

In Automatic Train Management System the train will sence any obsticle or any object from a particular distance through Ultrasonic sensors and reduce its speed, break or resume according to the object.
All gateways sensing the train and automatically controlled all of the traffic management. 
The automatic train also controlled it speed according to color code which is on the track like (red for stations to stop, green for forsterst or non populated areas speed up and yellow for cities or populated areas to slow down). 
The fault deduction machine IC checking the track and send location and faults of tracks to the Control room through GPS system.
That all of controlling multicontroller (arduino uno). The website of the Automatic Train Manangement system can allows the online tickiting system 
and providing the services.

Benefits of the Project

  •  No train accident 
  • Managing time
  • Online ticketing system
  • Aknowledge through SMS or email
  • Automatic fault detections of tracks  

Technical Details of Final Deliverable

Kindly find my Technical Detail picture from a drop box.

  • Website
  • Control room
  • Automatic  track fault checking
  • Managed stations  
  • All lighting and AC system automatically controled

Final Deliverable of the Project

HW/SW integrated system

Type of Industry

Transportation

Technologies

Artificial Intelligence(AI)

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Sensors Equipment8150012000
Screens for display Equipment11000010000
Arduino Equipment420008000
GPS module,Multi-sensor Modules Equipment130003000
Chips & other Accoessories Equipment320006000
Hardware and Models Equipment11000010000
Cables, Resistors, Batteries Equipment21000020000
Total in (Rs) 69000
If you need this project, please contact me on contact@adikhanofficial.com
0
117
PATHOLOGY DETECTION BY IMAGE PROCESSING OF X-RAY IMAGES

An approach to solve the modern problem with deep learning tools. The radiologist often di...

1675638330.png
Adil Khan
9 months ago
Voice and data communication over power transmission lines

Voice communication and data transmission at a time on a single existing power line t...

1675638330.png
Adil Khan
9 months ago
Tailor Master

Tailoring is one of the most common and low investment business in Pakistan. We are planni...

1675638330.png
Adil Khan
9 months ago
Solid State DC Circuit Breaker

Direct Current (DC) circuit breaker is an important element for the stable operation of DC...

1675638330.png
Adil Khan
9 months ago
Micro Inverter for Photovoltaic Systems

Micro-Inverter for Photo-Voltaic Systems (PV) is designed to illustrate the conversion of...

1675638330.png
Adil Khan
9 months ago