AUTOMATIC RECYCLING WASTE SORTING PLANT

Automatic is watch word of today. Garbage is a serious problem now a days, everyday the huge amount of garbage is to be disposed in increasing population and the quantity of items used in daily life. Burning the garbage creates environmental hazards and harmful gases which pollutes the environment.

2025-06-28 16:30:24 - Adil Khan

Project Title

AUTOMATIC RECYCLING WASTE SORTING PLANT

Project Area of Specialization Shared EconomyProject Summary

Automatic is watch word of today. Garbage is a serious problem now a days, everyday the huge amount of garbage is to be disposed in increasing population and the quantity of items used in daily life. Burning the garbage creates environmental hazards and harmful gases which pollutes the environment. This is need of green technology to combat the problems. In this study we will discuss one method to resolve that problem successfully and economically.

As technology increased, life style changes and a lot of products are in disposable forms which create garbage in huge amount. This garbage can not be burnt or disposed easily and safely. Therefore there is need of a system in which we can sort out different type of garbage on the basis of their material that can be recycled or disposed accordingly.

Project Objectives

ADDITIONAL (  If time allowed)

Project Implementation Method

First of all we will design the conveyor belt system i.e. conveyor path to move the materials continuously. It will be done by using DC motor and necessary items. After designing conveyor system sensors are to be used for detection purpose.  Next these sensors to be added to the conveyor path side by side. By utilizing servo motors we will built an arm for sorting the material to the desirable box. Arm will also be placed to conveyor path side by side accordingly. An arduino will be used for performing required operations with the help of programming.

Benefits of the Project Technical Details of Final Deliverable
  1. Controlling of arm by arduino.it required 5v for working.
  2. Detection of material using sensors.
Final Deliverable of the Project HW/SW integrated systemType of Industry Energy , Health Technologies Shared Economy, Clean TechSustainable Development Goals Affordable and Clean Energy, Decent Work and Economic Growth, Climate ActionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 53700
DC stepper motor Equipment6300018000
Tower Pro MG-945 servo motor Equipment68004800
sensors Equipment68004800
Ardiuno mega Equipment218003600
conveyor belt Equipment135003500
thesis priting/binding Miscellaneous 240008000
jumper wires Miscellaneous 42501000
soldering wire and paste Miscellaneous 1350350
poster print Miscellaneous 1200200
tape/markers/gulestics Miscellaneous 1450450
soldering iron Equipment120002000
glue gun Equipment110001000
multimeter Equipment120002000
Brushless motor Equipment220004000