Project Summary

Electrical power system is the major source to provide energy for residential, commercial, industrial, and agricultural loads. Now a days, the demand of power is increasing day by day. The difference between demand and supply causes consumers to suffer from the unwanted load shedding. A total blackout may occur due to this increase in the power demand. The aim of this project is to automatically disconnect loads when there is not enough energy generation, on priority basis. Using PLC we will automatically turn on or off generators also, according to the requirement of load. Due to disconnection of surplus generators, overall efficiency of power system will be increased.

The implementation of the project consists of following: (1) Power measurement of load and generators using current and potential transformers. (2) Comparison of load power and generation power using PLC programming. (3) Disconnection of low priority loads when demand is more than power generation, using magnetic contactors. (4) Turn off surplus generators if demand is less than power generation. (5) Turn on second generator when demand increases than the maximum rated load of first generator. (6) Automatically synchronize second generator with first one when it is restarted. (7) Real time storage and displaying of power data on HMI.

Project Objectives

  • Power measurement of loads and generators.
  • Priority based switching of loads when the generating power is less than the demand. 
  • Automatic switching of generators efficiently.
  • Shed the minimum amount of load to maintain system stability.
  • Real-time storage and display of data on HMI.
  • Design of synchronous module for synchronization of generators.

Figure 1. Objectives for Automatic Priority Based Power Load Switching Using PLC

Project Implementation Method

Figure 2. Implemented Architectural Diagram for Automatic Priority Based Power Load Switching Using PLC

Figure 3. Measuring Instruments Block Diagram on Generators side

Figure 4. Measuring Instruments Block Diagram on Load side

Benefits of the Project

  • Unwanted load-shedding will be reduced.
  • Stability of power system will be increased.
  • In case of fault, minimum amount of load will be shed.
  • More user friendly.
  • People lives will be saved.
  • Man Effort will be minimized.

Technical Details of Final Deliverable

  • Power measurement by using CT and PT, on load and generators side. CT ratings are 10A/1V, PT ratings are 220V/12V
  • Outputs of these CT/PTs are fed into analog module's inputs. Analog module reads analog values and send them to the PLC. 
  • Two single phase generators will be synchronized by measuring their voltage using potential transformer and frequency using tachometers. Generators are of rating 220v, 50Hz and 2kW.
  • PLC will make decision on contactors according to power requirement.
  • Real time data is also displayed on HMI.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Others

Core Technology

Artificial Intelligence(AI)

Other Technologies

Others

Sustainable Development Goals

Industry, Innovation and Infrastructure, Sustainable Cities and Communities, Responsible Consumption and Production

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
PLC FATEK FBS-32MAR2-AC (D24) Equipment11800018000
FATEK AIO module FBS-6AD Equipment11455014550
Single phase AC generator (2kW STC alternator) Equipment21360027200
Motor for driving alternator (FM15 WITH FC 143) Equipment222004400
FATEK PLC programming cable Equipment123002300
SCT013 Current Transformer (100A / 500mA) Equipment700
Potential Transformer (220 / 12V Step down) Equipment72801960
PUMA digital RPM meter (Tachometer) Equipment200
Magnetic contactor 220 V Equipment700
Posters, reports and remaining components Miscellaneous 5200010000
Total in (Rs) 78410
If you need this project, please contact me on contact@adikhanofficial.com
Smart Pill Manager

There can be a lot of individuals out there who need constant help ? may it be our elderly...

1675638330.png
Adil Khan
9 months ago
Solar And Wind Charged Hybrid Electric Vehicle

With the advancemement  in 21st century there has been increase in usage of oil and g...

1675638330.png
Adil Khan
9 months ago
Plc based Industrial bottles filling and liquid mixing for control &am...

In this era of industrialization, technological revolution/automation is fast shrinking th...

1675638330.png
Adil Khan
9 months ago
IOT Based Mechanized Water Automizer System For Industrial Farming By...

The IOT based mechanized water atomizer system is an automated precision farming machine d...

1675638330.png
Adil Khan
9 months ago
Wearable Augmented Reality for sports training assistance

The revolutionary advancement of the current era has led us to numerous new ways to achiev...

1675638330.png
Adil Khan
9 months ago