Automated Fortification and Smart Monitoring of Distribution Transformer

Distribution Transformers (DTs) are essential part of WAPDA's distribution system.They are affected due to overloading,phase unbalancing and internal hydration which result in overheating and short circuit and eventually they are decayed.In summer due to much overloading, the number of burnt tr

2025-06-28 16:30:22 - Adil Khan

Project Title

Automated Fortification and Smart Monitoring of Distribution Transformer

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Distribution Transformers (DTs) are essential part of WAPDA's distribution system.They are affected due to overloading,phase unbalancing and internal hydration which result in overheating and short circuit and eventually they are decayed.In summer due to much overloading, the number of burnt transformers incease and a lot of money is required in workshops for their reclamation.Therefore,as we have a protection system for power transformers we must have a protection and a monitoring system for DTs to avoid a burden on our economy.For this purpose we are prepairing a prototype for DTs automatic protection from above mention affects and also an IoT based monitoring system for their quick replacement before they are decayed.The proposed prototype will protect the transformer from overloading,overheating and will cool it too with the help of fans.The measured parameters will be sent to a web based server after every 15 seconds for transformer monitoring whether it is working in normal condition or a critical condition.Hence in last which is a main thing i.e we will have a data stored which will help us to enhance our research in this field and bring more enhancements and advanced systems for power distribution with very low power losses and hence an ever green Pakistan.

Project Objectives

Our aim is to develop and implement an IoT based system for smart monitoring and automated protection of distribution transformer. This system will surmount the following objectives:

1. Measure the temperature and humidity of DT along with the voltage and current for all three phases.  

2. Real time transmission of monitored values on a web-based server using GPRS.  

3. Real time Protection against over voltage, over current and high temperature.  

4. Storage and GUI based visualization of data at control room.  

Project Implementation Method Benefits of the Project Technical Details of Final Deliverable
  1. A device for distribution transformer with a lot of features built in such as it's protection from overcurrent,overvoltage and high temperature.
  2. Very less or no man power is required because a proposed protection system is an automatic system.
  3. 24 hours monitoring of measured parameters for analyzing it's performance.
  4. A quick replacement of transformer is an additional option on the bases of real time data which will be monitored in a control room with the help of GPRS.
  5. The measured data will be stored after every 15 seconds with which we will analyze further enhancements and hence opportunity of research will increase for advanced systems.
Final Deliverable of the Project HW/SW integrated systemCore Industry OthersOther Industries IT , Manufacturing , Telecommunication Core Technology Internet of Things (IoT)Other Technologies Cloud InfrastructureSustainable Development Goals Decent Work and Economic Growth, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 74100
Three phase Distribution Transformer Equipment11500015000
Diodes Equipment10550
Resistors Equipment10550
Zener Diodes Equipment10550
Arduino UNO Equipment27001400
Web Server Equipment120002000
Capacitors Equipment1010100
Temperature and humidity sensors Equipment150005000
Current Transformer Equipment3650019500
Potential Transformer Equipment320006000
Fast Trip Relay Equipment11680016800
Pro Signal Thermometer Equipment1350350
Current Voltmeter Tester Equipment137003700
Hard Board Miscellaneous 1500500
PCB Layout Miscellaneous 210002000
Cutting pliers Miscellaneous 2200400
Screw Drivers Miscellaneous 250100
Drills Miscellaneous 110001000
Nuts Miscellaneous 205100