The main objective of this project is to provide in the power system transformers may be loaded beyond their nameplate ratings due to a fault or some emergency conditions. This type of overloading can cause either short term failures or long term failures. Increase in hot spot temperature would also
Auto Power Supply Control System from four different sources to ensure no break power
The main objective of this project is to provide in the power system transformers may be loaded beyond their nameplate ratings due to a fault or some emergency conditions. This type of overloading can cause either short term failures or long term failures. Increase in hot spot temperature would also lead to the accelerated ageing of the transformers resulting in transformer overload. So in order to keep the body temperature of the transformer within its nameplate rating, the transformer must be loaded efficiently in a controlled manner
We decided to make an electrical system which solve these issue to ensure continuous supply under over load condition by load sharing.
Thus by the sharing load on transformer the transformer is protected .This will be done by connecting another transformer in parallelThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
The benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
The benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
decided to make an electrical system which solve these issue to ensure continuous supply under over load condition by load sharing.
Thus by the sharing load on transformer the transformer is protected .This will be done by connecting another transformer in parallelThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| transformer 10A | Equipment | 2 | 7000 | 14000 |
| aurdino uno | Equipment | 1 | 1500 | 1500 |
| 5v relay | Equipment | 1 | 800 | 800 |
| LCD Display16*2 | Equipment | 1 | 230 | 230 |
| Hall effect sensor | Equipment | 1 | 1200 | 1200 |
| Potentiometer | Equipment | 1 | 50 | 50 |
| Circuit breaker | Equipment | 2 | 5000 | 10000 |
| resistor | Equipment | 4 | 4000 | 16000 |
| Total in (Rs) | 43780 |
The aim of the project is to mainly focus on the ease of controlling a heating system alon...
Summary We travel around by driving our own car, public transports, or walking. Public tr...
The present world relies on clean and continuous power supply, which means relying on Rene...
Students and new Researchers can not easily detect the non indexed research papers/low qua...
working: Dataset Full database Non functional gui functional gui Database connected to ap...