This project use energy from Solar, Wind and WAPDA sources efficiently by combining them intelligently, as per the requirement of the load. Solar and wind sources are used as first pirority and WAPDA is used as backup source for energy requirement.
Advance hybrid power conteol technique
This project use energy from Solar, Wind and WAPDA sources efficiently by combining them intelligently, as per the requirement of the load. Solar and wind sources are used as first pirority and WAPDA is used as backup source for energy requirement.
To encourage the preferential use of renewable energy sources in Pakistan.
Generating energy that produces no greenhouse gas emissions from fossil fuels and reduces some types of air pollution.
Diversifying energy supply and reducing dependence on imported fuels
Cost on consumption of energy is minimized
Final deliverable of this project is hardware setup which manage all three energy providing sources and efficiently switch between them as per the requirement of load.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Solar panel | Equipment | 1 | 3000 | 3000 |
| wind model | Equipment | 1 | 2000 | 2000 |
| Arduino Nano | Equipment | 2 | 500 | 1000 |
| Capacitor | Equipment | 8 | 30 | 240 |
| IC | Equipment | 4 | 20 | 80 |
| Mosfet chip | Equipment | 14 | 50 | 700 |
| heat sinker | Equipment | 12 | 10 | 120 |
| Arduino Uno | Equipment | 1 | 900 | 900 |
| PCB Board & Fabrication | Equipment | 2 | 750 | 1500 |
| Resistors | Equipment | 40 | 3 | 100 |
| Transformer | Equipment | 2 | 2000 | 4000 |
| Wero Board | Equipment | 4 | 180 | 720 |
| Connectors | Equipment | 14 | 10 | 140 |
| Leds | Equipment | 8 | 5 | 40 |
| Bulb | Equipment | 3 | 150 | 450 |
| Holder | Equipment | 3 | 80 | 240 |
| wires | Equipment | 2 | 100 | 200 |
| printing | Miscellaneous | 10 | 30 | 300 |
| Travelling | Miscellaneous | 20 | 100 | 2000 |
| wooden Board | Miscellaneous | 1 | 600 | 600 |
| Screw & nuts | Miscellaneous | 36 | 5 | 180 |
| others | Miscellaneous | 10 | 100 | 1000 |
| Total in (Rs) | 19510 |
The project "Rassbery pi based Autanomus based line tracking robot using camera"is based n...
Currently most Micro-Hydro Power (MHP) plants are monitored manually in Pakistan. Due to t...
As we know that customer plays an important role for any business. The more customers you...
This project is based on Gu university for helping new comers to know everything about Gha...
Now a days the world is facing a huge problem of security almost in every part of life. Th...