This proposal is about designing & developing a prototype smart robotic system with the objective to sense the obstacle under the surface of earth. The system will be able to transmit the information on real time bases. Our system will incorporate state of the art technologies based o
UNDER SURFACE OBJECT DETECTION SMART ROBOT BASED ON GSM COMMUNICATION (UODSRS)
This proposal is about designing & developing a prototype smart robotic system with the objective to sense the obstacle under the surface of earth. The system will be able to transmit the information on real time bases. Our system will incorporate state of the art technologies based on artificial intelligence, Internet of things and pervasive computing technologies to mitigate and automate the mankind physical efforts. In such situations, the environmental actions are partially controllable and observable by the smart robot system. The existing robotic systems do not have the capability to directly control the human actions but surely have the ability to partially observe different scenarios. In the proposed project, we have targeted a new paradigm that will incorporate the AI and smart sensing techniques with the sole aim to develop a fully autonomous Smart Robotic System. The autonomous system will be capable to detect obstacles and send SMS alert via GSM module.
The agile process model will be used to develop the project. The overall project strategy would consist of six phase as mentioned below .
Phase-1: [Requirement gathering/Communication]
In this phase we will develop SRS (Software Requirement Specifications) to reflect complete requirement perspective about the projec.
Phase-1I: [Planning]
Predictive methods entirely depend on the requirement analysis and planning done in the beginning of cycle. Any changes to be incorporated go through a strict change control management and prioritization.
Phase-III: [Design]
In this design phase we will choose plan for a solution of the problem which are specified by the document.
Phase-IV: [Implementation]
In this phase the system is actually build. The first step will be the construction, during which the system is build and tested to ensure it will perform as it is supposed to be.
Phase-V: [Testing]
In this phase we will test our coding and install it on hardware, and will again test the final result.
Phase-VI: [Review]
In this phase the assessment will be done. This phase will accomplished when project is complete.
The technical and final deliverable of the proposed project will be consist of the following.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Arduino | Equipment | 3 | 2800 | 8400 |
| DC Moters | Equipment | 4 | 130 | 520 |
| Sensors | Equipment | 5 | 1000 | 5000 |
| Jumper wires | Equipment | 5 | 200 | 1000 |
| Proteus IDE | Miscellaneous | 1 | 3000 | 3000 |
| Stationary | Miscellaneous | 2 | 600 | 1200 |
| Thermal Camera | Equipment | 1 | 20000 | 20000 |
| Total in (Rs) | 39120 |
From autonomous vacuum cleaners to large area security systems, autonomous machines are a...
In today?s world, people want everything to be organized and want to be in quick. So, they...
The overhead transmission line, which often has varieties of small or large disturbances i...
Walking robots have been researched during the last four decades in an effort to replicate...
Humans perform many tasks efficiently, but some operations negatively impact human health...