Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Synchronized Dual Axis Movement of Multiple Solar Panels Using One Controlling unit for Maximum Power Point Tracking MPPT

Electrical energy can be obtained from solar energy by using solar panels. This type of conversion is environment friendly unlike Thermal and Nuclear Power Plants. It enhances the clean and emission free production of energy. In Solar Power Plants, primary energy source is free of cost and has no ru

Project Title

Synchronized Dual Axis Movement of Multiple Solar Panels Using One Controlling unit for Maximum Power Point Tracking MPPT

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Electrical energy can be obtained from solar energy by using solar panels. This type of conversion is environment friendly unlike Thermal and Nuclear Power Plants. It enhances the clean and emission free production of energy. In Solar Power Plants, primary energy source is free of cost and has no running cost. The main concern related to Solar Power Plant is low efficiency of solar panels. Low efficiency can be improved by tracking the maximum power point (MPPT) of solar panels. The MPPT can be achieved by changing the position of solar panel according to movement of Sun. The position of solar panel can be changed by single axis rotation and dual axis rotation. In current project, dual axis rotation of solar panel will be used for MPPT because of its greater efficiency than single axis rotation. Further the dual axis movement of two solar panels will be synchronized using one controlling unit. This will show a look of Solar Power Plant. Proteus based simulations and a small scale physical implementation of our project will be presented at the end. The developed system can be used on commercial level (Solar power plant, solar auto-mobiles, Spaceships and Satellites etc) as well as on domestic level.  

Project Objectives

  1. Proteus based simulation will be performed for dual axis movement of solar panel.
  2. Dual axis movement of solar panel will be implemented for maximum power point tracking to improve its efficiency.
  3.  Movement of two solar panels will be synchronized by using one controlling unit. This will show a look solar plant.

Project Implementation Method

Steps for project implementation are given below.

  • Selection of area of interest.
  • Selection of project.
  • Literature review
  • Software implementation
  •  Using Kiel tool to Writing code for Arduino
  • Using Proteus for Simulation
  •  Hardware implementation
  • Design of mechanical structure
  • Dual axis movement of solar panel
  • Synchronizing the movement of two solar panels using one controller.
  • Results
  • Report writing
  • Presentation and Defense

Benefits of the Project

  1. It enhances the clean and emission free power production.
  2. Primary source is free and natural.
  3.  It can contribute against global warming.
  4. It can be used for small and medium scale power generation.
  5. For power generation at remote places where power lines are not accessible
  6. For domestic backup power system
  7. It can be used at large scale for load sharing with grid.

Technical Details of Final Deliverable

  1. Proteus based simulation for dual axis movement of solar panel.
  2. Physical model: Dual axis synchronized movement of two solar panels using one controlling unit.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Manufacturing

Core Technology

Clean Tech

Other Technologies

Shared Economy

Sustainable Development Goals

Affordable and Clean Energy, Decent Work and Economic Growth

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Solar Panel Equipment2600012000
LDRs Equipment151001500
Motor Drive Equipment4400016000
Stepper Motor Equipment4500020000
Shipment Cost Equipment180008000
Arduino Equipment2500010000
Others Miscellaneous 11000010000
Total in (Rs) 77500
If you need this project, please contact me on contact@adikhanofficial.com
0
205
Geyser Thermostat Monitoring

The paper showed how an intelligent water geyser device was built. The objective of implem...

1675638330.png
Adil Khan
1 year ago
Smart wearing back corset for keeping the fixation surgery patient bac...

SUMMARY: Nowadays people who have undergone fixation surgery tend to have backlash or repe...

1675638330.png
Adil Khan
1 year ago
E Services Finder and Provider App

Online Home Service platform The platform helps customers book reliable & high quality...

1675638330.png
Adil Khan
1 year ago
SMART ATTENDANCE SYSTEM

This system -SMART ATTENDANCE SYSTEM- marks the attendance of a student automatically when...

1675638330.png
Adil Khan
1 year ago
Cambulance

The problem that needs to be coped up is the delay in saving a life. In a serious car cras...

1675638330.png
Adil Khan
1 year ago