Smart Automatic Railway gates controlling using steel curbs and aurdion

The main purpose of this project is to find a solution for the railway line crossings on the main roads in Pakistan. The old manual methods are very slow and always consist of safety risks. The manual systems work by the gatekeeper to close the gate on the railway crossing at the arrival of the trai

2025-06-28 16:24:58 - Adil Khan

Project Title

Smart Automatic Railway gates controlling using steel curbs and aurdion

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

The main purpose of this project is to find a solution for the railway line crossings on the main roads in Pakistan. The old manual methods are very slow and always consist of safety risks. The manual systems work by the gatekeeper to close the gate on the railway crossing at the arrival of the train at nearby stations. There are several railway crossings that don’t have a railway crossing gate and the gatekeepers thus it is common to have accidents on these railway crossings.
 Our purpose system will help with these problems.

Smart Automatic Railway Gate Controlling Using Arduino and Steel Curbs” is a modest but very useful scheme, which allows the railway barrier to open and close robotically when the train is detected. It requires programming the process of railway gate control to totally avoid human interference at level junctions. It would help resolve the issues faced by the manual systems and decreases the losses/accidents.  The proposed system “Smart Automatic Railway Gate Controlling Using Arduino and Steel Curbs” would force stop the traffic by pulling down the barriers before the train approaches the crossings.
2. PROBLEM STATEMENT
This project apparently contracts with one of the greatest public problems is traffic jams besides a railway crossing.  The manually operated railway crossing requires a 24/7 gatekeeper and this gatekeeper needs to be contacted with the staff at nearby stations all the time. The staff would inform the gatekeeper at the arrival of the trains at the nearby stations, after getting information from the staff the gatekeeper will immediately close the gate at the railway crossing. It will stop the flow of traffic for a certain period (sometimes it takes more time than usual due to the crossing of two trains at the nearby train stations) which results in traffic jams and waste of time.
The second major problem, there are many railway crossings that don’t have a railway crossing gate and the gatekeepers as well therefore, it is common to have accidents at these railway crossings

Project Objectives Project Implementation Method

frist of all we buy all material  related to project then we focus on our proposal and start work on project first of all we make the base of project and install all equipments of prroject according to diagram then we install sotware on aurdino and run the project.

Benefits of the Project Technical Details of Final Deliverable

servo motor 

IR sensors 

aurdino mega 

steel Curve 

Bread Board

Train & track

I 2C display

jumper wires

Final Deliverable of the Project HW/SW integrated systemCore Industry OthersOther Industries Transportation Core Technology RoboticsOther Technologies OthersSustainable Development Goals Decent Work and Economic Growth, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 28000
servomotor Equipment220004000
aurdino Equipment125002500
steel kerbs Equipment415006000
I2c display Equipment210002000
iIR sensors Equipment155007500
jumper wires Miscellaneous 100101000
LED Miscellaneous 2020400
traffic lights Miscellaneous 65003000
Bread Board Equipment25001000
capacitors Miscellaneous 1020200
Resistors Miscellaneous 1040400

More Posts