Single phase grid tie inverter
Power generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient. Grid tie inve
2025-06-28 16:35:02 - Adil Khan
Single phase grid tie inverter
Project Area of Specialization Electrical/Electronic EngineeringProject SummaryPower generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient.
Grid tie inverter which convert DC power into AC power have the ability to synchronize for interfacing to the utility lines. It's required to match the frequency, phase and voltage of inverter to that grid so that they can synchronize to provide energy to the grid.
Project Objectives1- Getting pure sine wave at the output of grid tie inverter.
2- Synchronization of inverter output and grid.
Project Implementation Method1- To do literature survey.
2- To simulate the circuit.
3- To test the simulation of circuit.
4- To design hardware circuit.
5- To test the hardware working.
Benefits of the Project1- Project based on renewable energy resources which in itself is useful and helpful not only for overcoming the energy crisis but also being environmental friendly.
2- Ability to supply electricity not only to the users but to grid as well.
3- It contains own generation and distribution to the grid which eliminates the use of electricity of grid and saving bills.
Technical Details of Final DeliverableFinal deliverable is working hardware and report of the project in the report following points are covered.
1- Introduce
2- Literature survey
3- Research methodology and analysis
4- Design or theoretical framework
5- Implementation and results
6- Conclusion
Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other Industries Others Core Technology OthersOther Technologies Shared EconomySustainable Development Goals Affordable and Clean EnergyRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 24000 | |||
| Controller | Equipment | 1 | 2000 | 2000 |
| Driver transfer | Equipment | 1 | 2500 | 2500 |
| Switching circuit board | Equipment | 1 | 9000 | 9000 |
| Power transformer | Equipment | 1 | 1000 | 1000 |
| Main circuit board | Equipment | 1 | 4000 | 4000 |
| Synchronize circuit | Equipment | 1 | 5500 | 5500 |