Single phase grid tie inverter

Power generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient. Grid tie inve

Project Title

Single phase grid tie inverter

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Power generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient.

Grid tie inverter which convert DC power into AC power have the ability to synchronize for interfacing to the utility lines. It's required to match the frequency, phase and voltage of inverter to that grid so that they can synchronize to provide energy to the grid.

Project Objectives

1- Getting pure sine wave at the output of grid tie inverter.

2- Synchronization of inverter output and grid.

Project Implementation Method

1- To do literature survey.

2- To simulate the circuit.

3- To test the simulation of circuit.

4- To design hardware circuit.

5- To test the hardware working.

Benefits of the Project

1- Project based on renewable energy resources which in itself is useful and helpful not only for overcoming the energy crisis but also being environmental friendly.

2- Ability to supply electricity not only to the users but to grid as well.

3- It contains own generation and distribution to the grid which eliminates the use of electricity of grid and saving bills.

Technical Details of Final Deliverable

Final deliverable is working hardware and report of the project in the report following points are covered.

1- Introduce

2- Literature survey

3- Research methodology and analysis

4- Design or theoretical framework

5- Implementation and results

6- Conclusion

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Others

Core Technology

Others

Other Technologies

Shared Economy

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Controller Equipment120002000
Driver transfer Equipment125002500
Switching circuit board Equipment190009000
Power transformer Equipment110001000
Main circuit board Equipment140004000
Synchronize circuit Equipment155005500
Total in (Rs) 24000
If you need this project, please contact me on contact@adikhanofficial.com
0
192
Student Career Counselling System

Proper career guidance would help you in implementing and leading toward a future course o...

1675638330.png
Adil Khan
1 year ago
Real Time Security System

As we know that a street crimes are increasing day by day. Which are the main concern of t...

1675638330.png
Adil Khan
1 year ago
Design and Fabrication of advance forklift truck model for material ha...

Material handling may improve customer service by making items easier to manage, move, and...

1675638330.png
Adil Khan
1 year ago
Smart dustbin

This project is designed to provide the person with the ease not to move for throwing...

1675638330.png
Adil Khan
1 year ago
Tourismo

Tourism plays a crucial part in strengthening the economy, which helps the  country a...

1675638330.png
Adil Khan
1 year ago