Scheduling of parts to improve value aided work in process in manufacturing industry

Our project is on scheduling of parts to improve value aided work in process in manufacturing industry.Scheduling is basically the process of arranging controlling and optimizing the work and work loads in manufacturing process and production process.In manufacturing the purpose of scheduling is to

2025-06-28 16:29:01 - Adil Khan

Project Title

Scheduling of parts to improve value aided work in process in manufacturing industry

Project Area of Specialization Mechanical EngineeringProject Summary

Our project is on scheduling of parts to improve value aided work in process in manufacturing industry.Scheduling is basically the process of arranging controlling and optimizing the work and work loads in manufacturing process and production process.In manufacturing the purpose of scheduling is to minimize the production time and cost.So our project is on to improve value aided work in process.Basically the value aided work in process is the partially completed goods which are typically turn from raw material to finished product.The industry which I selected is spark packages industry. It manufacture cardboard and corraughted boxes. Then we applied the different dispatching rules and  also different algrothm such as NEH algrothm.So by doing this we reduce the makspan and also improve value aided work in process.

Project Objectives

Some objective of our project are:

Optimize value aided work in process.

Reduce cost associated with value addition.

Achieve the customer demand.

Project Implementation Method

I selected the spark packages industry and we reduce the value aided work in process So by using the different tools and software we reduce the makspan and also we achieve our objective and then we implement on the industry.

Benefits of the Project

The benefit of our project is that company will save a a lot of money that by reducing the makspan and achevie the customer demand.

Technical Details of Final Deliverable

By using different tolls we make the model and also these models are applicable on every industry just by changing the processing time.

Final Deliverable of the Project Software SystemCore Industry ManufacturingOther IndustriesCore Technology Shared EconomyOther TechnologiesSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 67120
Mathematica software license Equipment13060030600
MATLAB software license Equipment11782017820
SIMIO sotware Equipment147004700
Printer Equipment150005000
Different gadget for measuring transportation time and process time. Equipment320006000
Others Miscellaneous 215003000