Rules Of the Road (ROR)

There are many driving institutes available where you have to manually drive a car. There is a chance of an accident in learning from such driving institutes where you must pay for the damage. Also, our roads? condition is not very good according to the standards due to which accident rates are very

2025-06-28 16:29:00 - Adil Khan

Project Title

Rules Of the Road (ROR)

Project Area of Specialization Computer ScienceProject Summary

There are many driving institutes available where you have to manually drive a car. There is a chance of an accident in learning from such driving institutes where you must pay for the damage. Also, our roads’ condition is not very good according to the standards due to which accident rates are very high in our country.

To solve this problem government should make efforts which will take a long period of time to solve this issue, but we can solve this problem up to 60% by making a virtual environment. We are making a driving simulator in which the user will interact with the artificial environment of the car driving on the road.

User will be able to learn the standard rules and regulations of driving and the user will feel safe in any case which could cause road accident. The user will be able to drive in a safe environment without having any technical issue in the car and, the user will also get use to this environment quickly because of easy user interface interaction.

Project Objectives

Our main objective is to let people learn the standard rules and regulations of driving in a virtual environment so that people will become more aware of their surroundings and easily understand sense of driving properly so that less accidents will occur.

Project Implementation Method

We will implement our project through waterfall model. Phases of implemented method
as follows:


1. Requirement gathering and Analysis: All possible requirements of the system to be
developed are captured in this phase and documented in a requirement specification
document.


2. System Design: The requirement specifications from first phase are studied in this
phase and the system design is prepared. This system design helps in specifying
hardware and system requirements and helps in defining the overall system
architecture.

3. Coding / Implementation: With inputs from the system design, the system is first
developed in small programs called units, which are integrated in the next phase. Each
unit is developed and tested for its functionality, which is referred to as Unit Testing.
 

4. Integration and Testing: All the units developed in the implementation phase are
integrated into a system after testing of each unit. Post integration the entire system is
tested for any faults and failures.


5. Deployment of system: Once the functional and non-functional testing is done; the
product is deployed in the live environment.

System Architecture Diagram:

'Rules Of the Road (ROR)' _1659394363.png

Benefits of the Project Technical Details of Final Deliverable Final Deliverable of the Project HW/SW integrated systemCore Industry ITOther Industries Education , Energy Core Technology Internet of Things (IoT)Other Technologies Augmented & Virtual RealitySustainable Development Goals Good Health and Well-Being for People, Life on LandRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 75000
Logitech Wheel g29 Equipment13500035000
Graphics Card Equipment13500035000
Printing Cost Miscellaneous 510005000