Robotic Arm

Our project mainly deals around the shearing operation, were the sheet is picked manually and placed on the belt for shearing which involves risk factor. Our challenge is designing of pick and place operator to carry the sheet from the stack and place it in the shearing machine for the feeding

Project Title

Robotic Arm

Project Area of Specialization

Artificial Intelligence

Project Summary

Our project mainly deals around the shearing operation, were the sheet is picked manually and placed on the belt for shearing which involves risk factor. Our challenge is designing of pick and place operator to carry the sheet from the stack and place it in the shearing machine for the feeding

Project Objectives

Designing, Modelling, and Simulation of the pick and place mechanism. We need to have a time study between currently undergoing a manual operation and a newly designed automated operation.

 The frequency of this operator, its repeatability, lifetime, etc. is to be found out.

 The choice of the end effector, its design, and analysis should be carried out and documented.

Project Implementation Method

The basic idea of this project is the implementation of the robotic arm. Though it can be implemented in various methods, when different parameters are taken into consideration this model is the most feasible way of implementation. Another way of enactment the model is by enabling them to adapt to their surroundings.

Benefits of the Project

  • Improved safety. Robotic arms help keep workers safe by operating in environments that are hazardous and executing tasks that present high risk of injury to humans.
  • Improved efficiency and productivity.
  • Enhanced precision
  • Greater flexibility.

Technical Details of Final Deliverable

The main reason to make the choice of designing a robotic arm firstly is the transport of the sheet from the stack to the shearing machine. Second, there is a space constraint we have in the industry. The stack of the sheets and the shearing machine are close to each other. They are so close that any other kind of transport such as a linear robot (conveyor) cannot be used. That leaves us with the only choice to build a robotic arm that can work in small and congested environments.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

IT

Other Industries

Others

Core Technology

Artificial Intelligence(AI)

Other Technologies

Robotics

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
PIC16F877A 8-bit Microcontroller Equipment21000020000
3D printed parts Equipment14300043000
16x2 LCD display Equipment410004000
servo motors Equipment310003000
Hardware and Structure Miscellaneous 11000010000
Total in (Rs) 80000
If you need this project, please contact me on contact@adikhanofficial.com
0
231
MOBILE PLATFORM DRIVER MONITORING AND SAFETY SYSTEM

Around the world, the total number of fatal road crashes is increasing regardless of the i...

1675638330.png
Adil Khan
1 year ago
Health Consult

In our busy lives it is very hard to manage time and google yourself what does your sympto...

1675638330.png
Adil Khan
1 year ago
Reactive Power Compensation Using FACTS Devices

Customer especially industries have to maintain power factor above certain limit otherwise...

1675638330.png
Adil Khan
1 year ago
Designing of low RPM generator for zero head hydro power plant

Running water has a lot of potentials to make electricity. If this power is tapedeconomica...

1675638330.png
Adil Khan
1 year ago
Deinventive

Dinventive is a platform which is related to designing and customizing t-shirts but thorou...

1675638330.png
Adil Khan
1 year ago