Adil Khan 11 months ago
AdiKhanOfficial #FYP Ideas

Relative Marking Result System

instructors are facing the Following issues: - system is very time consuming and take more effort to use if a teacher have more than one courses available. it is a file base system, so every course file when opens need to login again and again.    Ou

Project Title

Relative Marking Result System

Project Area of Specialization

Computer Science

Project Summary

instructors are facing the Following issues: -

  • system is very time consuming and take more effort to use if a teacher have more than one courses available.
  • it is a file base system, so every course file when opens need to login again and again.

   Our system will provide the following: -

  • We will provide a platform which will resolve the issues (relative marking, efficient result system) through this valuable work and it will work efficiently and effectively.
  • Our system will reduce the time of engineering document sharing.
  • It will greatly reduce human errors and will ensure confidentiality of the data and prevent unauthorized access.
  • We are providing three logins (admin login, coordinator login, instrucor login). Instructors view their current courses and make their result by real time data changing.
  • Coordinators post a notification for the instructors like to submit their results before last date etc.

Admins monitor the whole website and know either it is working properly or not. They can get feedback from the user and respond to it. They can add new things in the website They have the privilege to change the structure of the website.

Project Objectives

To provide a platform where teachers can manage their results of courses which are currently available to them. It contains a panel for coordinator of a department which allows to make a semester results very efficient and less human errors . Admin, coordinators and teachers have their own profile. This system can be used by all the departments of the university. The system can prove to be beneficial for the institute. Reduce man power and manual paper works for maintaining the records. Maintain the accuracy and consistency of the data. Maintain all the data.

Project Implementation Method

RMRS deals with relative base marking result system, which manages the student results in an organized way to reduce human errors. For coordinator, it helps to track the performance of students result and teacher activities. The system will have an administrator that will track and managed the whole online Result system. The user should be able to access his/her account from anywhere just by imputting the correct username and password.

Benefits of the Project

  • Managing Student Results
  • Admin/Coordinator/Instructors portal
  • Redundant human errors
  • Removing of File-System
  • Real Time data Change
  • Manages data in an organized way
  • Less time consuming
  • Easy to find/make results

Technical Details of Final Deliverable

In Relative Marking Result System, we are using Visual Studio 2015 and MS Sql Server 2014 (for database or managed results). Now the running system is based on File base system and name as RESULTMATE. Which is a very time consuming and more effort is consumed by the teachers.

Final Deliverable of the Project

Software System

Core Industry

Education

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Quality Education

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Domain Equipment115001500
hosting Equipment165006500
Printing Miscellaneous 35082800
Stationary Miscellaneous 20051000
Total in (Rs) 11800
If you need this project, please contact me on contact@adikhanofficial.com
Conversion of conventional bike into smart electric bike

The smart electric-bike is the best solution for bike riders. The main objective of our pr...

1675638330.png
Adil Khan
11 months ago
Shahi Bazar Multi Vendor Marketplace

Shahi Bazar  Shahi Bazar is an online multi-vendor marketplace which connects custome...

1675638330.png
Adil Khan
11 months ago
Using a Parrot Drone to Test and Verify Different Control Strategies

A parrot drone is like any other quadcopter but with an added advantage; it allows users t...

1675638330.png
Adil Khan
11 months ago
Autonomous Indoor Navigation through Quadcopter in GPS denied environm...

The use of Unmanned Aerial Vehicles (or UAVs) has seen an increased use in the across...

1675638330.png
Adil Khan
11 months ago
POWER TRANSMISSION USING LOW FREQUENCY AC AS AN ALTERNATE TO CONVENTIO...

Conventional transmission systems utilize either high voltage ac (HVAC), operating at 50 o...

1675638330.png
Adil Khan
11 months ago