Refrigerator Evaporator System (Multi-phase Flow)

In any refrigeration system, the evaporator plays a key role in the whole cycle. The purpose of the evaporator is to extract heat from the refrigerator cabin. At the inlet of the evaporator, the cold refrigerant in liquid form enters. While passing through tubes it absorbs heat from surrounding and

2025-06-28 16:34:46 - Adil Khan

Project Title

Refrigerator Evaporator System (Multi-phase Flow)

Project Area of Specialization Mechanical EngineeringProject Summary

In any refrigeration system, the evaporator plays a key role in the whole cycle. The purpose of the evaporator is to extract heat from the refrigerator cabin. At the inlet of the evaporator, the cold refrigerant in liquid form enters. While passing through tubes it absorbs heat from surrounding and changes its phase to vapor thus creating a cooling effect. The design of the cooling fins in the evaporator plays a key role in cooling. The purpose of this project is to analyse the different configurations of evaporator design for an existing refrigerator and by the means of simulation and analyses optimize it further.

Project Objectives Project Implementation Method

Applying Techniques of the Heat Transfer method.

Performing Analytical calculation of the designed system.

Ansys model design and development.

CFD analysis of the optimized model with detailed study of Phase Change Materials working phenomena.

Benefits of the Project

The research, analysis and experimentation on refrigerator evaporator system will help in designing and manufacturing of an evaporator design of high energy rating and energy sufficient final optimized design shall be presented which will directly benefit the sectors orienting the refrigeration cycles and research work is done will help in the further developments in this field for future researchers. Moreover problem of ice deposition shall be considered during the design and analysis portion which in turn will increase the efficiency of the evaporator.

Technical Details of Final Deliverable

Optimized design of a refrigeration system.

Comparison of our model with different configuration working models.

Efficiency, Power and calculation of other necessary parameters involved in the designed system.

Final Deliverable of the Project HW/SW integrated systemCore Industry OthersOther Industries Manufacturing Core Technology OthersOther TechnologiesSustainable Development Goals Industry, Innovation and Infrastructure, Responsible Consumption and ProductionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 55000
Aluminum Tubes Equipment140004000
Aluminum Sheet Equipment150005000
Copper Tubes Equipment140004000
Copper Sheets Equipment140004000
Thermocouples/Sensors Equipment240008000
Special Epoxies Equipment240008000
DC Supply Equipment140004000
Arduino UNO with Wires Equipment130003000
Mini Compressor Equipment150005000
Test Rig Establishment if reqiured Miscellaneous 11000010000

More Posts