This project strives to launch a framework for energy device to avoid the complete blackout. The results show that energy device is a viable option. The complete shutdown could be avoided and continuous supply of electricity will be ensured to high priority circuit board by selective load shed
Priority Based Load Monitoring Energy Device
This project strives to launch a framework for energy device to avoid the complete blackout. The results show that energy device is a viable option. The complete shutdown could be avoided and continuous supply of electricity will be ensured to high priority circuit board by selective load shedding. Graphical user interface provide new techniques to priorities the load according to the demand.
This project is designed for the purpose of load monitoring for load management to avoid complete blackout, as well as communicate with energy device to assure the supervision of the company. The model will be tested for varying amounts of power thefts through earthing and also for different types of circuit approximations. To ensure no power blackout, only priority based load shedding. Monitoring and supervision will be based on Internet of Thinks (IoT) that will give the supplier the ability to correct the power factor by controlling the consumer’s load consumption.
by hardware and software
There will be no power blackout, only priority based load shedding will be carried out. The consumers will understand their load patterns. A stable system for basic needs of electrical energy consumers in Pakistan. An application web server based monitoring system to monitor the power as well as control the consumer’s energy device. It has an IoT based monitoring system in which the data of consumed power, voltage, current and power factor will transmitted wirelessly to access the control of device and user consumption record can be made by electric supplier company.
Priority Based Load Monitoring Energy Device hepl in distribute in the Electricity and also we can the energy power and also improve the power factor
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| DC Power Supply | Equipment | 1 | 3000 | 3000 |
| Arduino Mega | Equipment | 1 | 1250 | 1250 |
| WI-FI Module | Equipment | 1 | 2500 | 2500 |
| 20x4 LCD | Equipment | 1 | 800 | 800 |
| Current Transformer | Equipment | 1 | 900 | 900 |
| Potential Transformer | Equipment | 1 | 900 | 900 |
| Dual Relay Module | Equipment | 2 | 750 | 1500 |
| casing of device | Equipment | 1 | 4000 | 4000 |
| Capacitor Bank | Equipment | 1 | 5500 | 5500 |
| IOT | Equipment | 2 | 2000 | 4000 |
| Visiting the Market | Miscellaneous | 4 | 2000 | 8000 |
| Total in (Rs) | 32350 |
Objective answers can be easily checked but checking subjective answers requires understan...
This project named ?Kid Palace web website? in an online shopping website. This website wi...
The antenna design is one of the most important factors to be considered in order to fully...
An SDR based signal Monitoring and Direction Finding System is to be designed and develope...
Our project title is DC Motor drive with feedback path.This was an industry project &...