Adil Khan 9 months ago
AdiKhanOfficial #FYP Ideas

PLC based Intelligent Energy Management System At Consumer Level

The ever-increasing demand for electricity has hampered the smooth operation of power systems. The vast majority of transmission line blackouts occur during critical hours, limiting the flexibility of the system. The constrained force is approved for a particular zone's appropriation scheme. Ho

Project Title

PLC based Intelligent Energy Management System At Consumer Level

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

The ever-increasing demand for electricity has hampered the smooth operation of power systems. The vast majority of transmission line blackouts occur during critical hours, limiting the flexibility of the system. The constrained force is approved for a particular zone's appropriation scheme. However, residential force use can exceed the maximum allowable, resulting in line over-burdening and blackouts. As a result, keeping local force utilisation below the breaking point becomes critical. The PLC-based burden the executive's system (PLMS) is used to initiate private or end-client request responses. A PLMS is connected to a variety of devices in private homes, ranging from smart metres to family unit devices. It monitors and manages the operation of the family apparatuses, allowing it to respond to requests such as load shifting and shedding in response to the utility's approved force cap.

Project Objectives

1. Programmed load control in the business during top hours.

2. Consequently observing all the heap boundaries of the machines on PC.

3. Programmed work prompts the decrease in an ideal opportunity for activity.

4. Decrease in odds of blunders brought about by physically activity

5.The load factor has been improved by proper management of load.

6. The billing cost on consumer behalf decreases as peak and off-peak load has been managed with considering consumer ease.

Project Implementation Method

Dynamic burden the board which force to specific shutoff or shut-down of frameworks segments that are inactive or underutilized-has demonstrated to be an especially viable strategy for decreasing powerloss in such frameworks. Consolidating a unique force, the board conspire in the structure of an effectively intricate framework is troublesome procedure that may require numerous plans. At last, we think about the force devoured by all radiator when closed on at the same time and when closed on at various time-sharing mode for a similar reason. Burden the executives is additionally one of the significant requirements for industry just as residential use. This can likewise be conceivable by dealing with the intensity of different burdens. At the point when any one burden builds then one of the heaps that is associated out of many is detached, in this need is doled out to different burdens and with the assistance of equipment and transfer rationale we will attempt to deal with the heap naturally. The need of separating is variable and can be changed now and again. The current prerequisite of various burden is diverse as the time shifts. Thus, as indicated by that evolving need, we can dole out various need to various burden. At the point when the current in any one burden expands then the all-out burden on the age procedure increments. The abundance burden may cause the force plant to trip. The cost required for restarting a force plant is significantly more. In this way, when the heap builds it is prudent to disengage any of the heaps that are associated. This procedure can be actualized in a programmed in this sort of venture

Benefits of the Project

Diminished Space, Energy saving, Modular Replacement, Easy exploring, Error diagnostics engineer, Economical, Greater life and immovable quality, The Compatibilities of PLC'S, Logic Control, Operator control, Signaling and posting, Coordination and correspondence.

The designed load management system on consumer behalf is important. Some of the technical features are listed below:

a) Low cost system: We are interested to produce a system which can easily be implemented anywhere with the less cost.

b) Maintenance: This system design has the less maintenance cost and it can be easily repaired. 

c) User friendly: It is very straight and easy to use. Even the common people can easily use it by their self.

Technical Details of Final Deliverable

Burden control during top hours has been finished by two methodologies for example equipment and programming draws near.

(a) Hardware Approach: In this methodology, an equipment circuit is manufactured so as to give programmed load control. It incorporates establishment of PLC, Relays.

(b) Software Approach: The programming of the PLC is done on the item named Winpro Ladder.

Observing all the heap boundaries of the machines on HMI has been finished by two methodologies for example equipment and programming draws near.

It incorporates establishment of Energy meter. 

Observing of all heap boundaries is done on the product. Simple Builder Pro.  

Programming in the Arduino programming assists with putting away all the heap boundaries of the framework.

Final Deliverable of the Project

Hardware System

Core Industry

Others

Other Industries

Petroleum

Core Technology

Big Data

Other Technologies

Others

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
PLC Fatek 14 MA Equipment11850018500
Weintek MT 8071 IP HMI Equipment12600026000
Communication Cable (PLC to HMI) Equipment1500500
TEC1-12706 Peltier Module Equipment232006400
Finder Relay 60.12.9.012.0040 Equipment48503400
Arduino UNO + Cable Equipment1500500
LM 044L LCD Equipment1500500
Electric Heater Rod Equipment1400400
DC Rechargeable Battery 12V Equipment121002100
PCB Board Equipment1500500
Capacitor Equipment1120220
Resistor Equipment2220440
Electric Bulb Equipment2300600
PC 817 opto- coupler IC Equipment1515225
Power Supply 200 W Equipment1500500
Step-down Transformer Equipment2400800
ACS-712 Current Sensor Equipment2140280
LM 7805 IC Equipment24590
LM 35 IC Equipment255110
Water Pump Equipment215003000
Diode 1N4007 Equipment60352100
Wire coil Equipment1200200
Socket Equipment2250500
Switch Equipment2150300
Hard board 5x4 Equipment115001500
Total in (Rs) 69665
If you need this project, please contact me on contact@adikhanofficial.com
plantable paper products

Every drop of water makes the mighty ocean  We strongly agree with this quote . every...

1675638330.png
Adil Khan
9 months ago
Power transformer protection Scheme during abnormal conditions

Power transformer is a static devise used for transforming power from one circuit to anoth...

1675638330.png
Adil Khan
9 months ago
IoT Based Smart Agriculture Robot

Conventional farming over uses fertilizers, pesticides and other resources an it is ver ti...

1675638330.png
Adil Khan
9 months ago
Frequency Based Approach For The Detection of Railway Tracks Faults in...

Pakistan has quite a shoddy record when it comes to railway accidents. Within the past dec...

1675638330.png
Adil Khan
9 months ago
BlueJay Event Management Application

The world is moving towards the trend of digitalizing our everyday activities. Now days, t...

1675638330.png
Adil Khan
9 months ago