Micro Hydro Turbo Generator for Remote Areas

Gilgit Baltistan region of Pakistan is spread over an area of 72,400sq km. The rivers and streams flows through almost every part of region. Fresh water is considered most important in the survival of humanity and other living organism. Gilgit Baltistan has been rich potential of fresh water, three

2025-06-28 16:34:07 - Adil Khan

Project Title

Micro Hydro Turbo Generator for Remote Areas

Project Area of Specialization RoboticsProject Summary

Gilgit Baltistan region of Pakistan is spread over an area of 72,400sq km. The rivers and streams flows through almost every part of region. Fresh water is considered most important in the survival of humanity and other living organism. Gilgit Baltistan has been rich potential of fresh water, three of the world largest glaciers are found in Gilgit Baltistan i.e. Biafo Glacier, Baltoro Glacier and Batura Glacier. Beside these glaciers 5,215 smaller glaciers and 2,420 glacial lakes are also located in Gilgit Baltistan.Electrical power place a vital role in over daily life and it is almost impossible to live without it. There are many methods to generating electrical power, one of which by deploying turbines on streams i.e. Hydro power plant (HPP). HPP convert potential energy of water into electricity. The water after generating electrical power is available for irrigation and other purposes. Hydroelectric powers plants (HPP) generate from few kW to thousand of MW so hydropower provided one on the best ways for rapidly expanding the country’s output.Once the electricity is produced, it must be delivered to where it is need. All the electricity made at power plants comes first through transformers which raise the voltage so it can travel long distances through power line.In proposed design of Hydro Turbo Generator (HTG), generator is not submerged into the water as of presently installed plants to resolve maintenance issues.The aim of the proposed project is design HTG for above mentioned areas where there are no resources available for site maintenance.The proposed HPP is generate electricity using water as fuel and will regulate the power. The performance of hydropower plants depends on many related parameters like hydraulic head, rate of flow, efficiency and selection of equipments.

Project Objectives

        Study,design and develop

  1. Turbine(Mechanics).
  2. Electrical(Generation and Distribution).
Project Implementation Method

Climate is the primary features that contribute to the hydrology of a region and is largely dependent on the geographical position on the earth’s surface. Climatic factors of importance are rainfall, its duration, intensity and aerial distribution. Other parameters are temperature, humidity, sunlight hours and wind run. All of these affect hydrological cycle. The climate of the project area can classified into two major seasons, wet (April-Oct) and dry Season (Nov-March).

Benefits of the Project

Hydro Power  have many benefits as compare to other renewable for elecric generation. Some are as under.

Technical Details of Final Deliverable

Input                                       

Output

Final Deliverable of the Project Hardware SystemType of Industry Energy Technologies RoboticsSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 80000
Mechanical Structure Equipment13000030000
Turbo Generator Equipment150005000
Control Unit Equipment180008000
Turbine shaft fan Equipment170007000
Panel Box with AVR Equipment11000010000
Gear Box Equipment170007000
Wire and screws Equipment130003000
Miscellaneous Miscellaneous 11000010000