in this project we will use LPG cyclinder instead of compressor and condenser for refrigeration purposes.By passing the LPG through capillary it,s pressure reduces and after that it is passed to the evaporator where cooling takes place and then carried to the burner

Project Title

low cost refrigeration using LPG

Project Area of Specialization

Mechanical Engineering

Project Summary

in this project we will use LPG cyclinder instead of compressor and condenser for refrigeration purposes.By passing the LPG through capillary it,s pressure reduces and after that it is passed to the evaporator where cooling takes place and then carried to the burner

Project Objectives

We will use no electricity for the refrigeration 

we will use no harmful refrigerant for cooling purpose

Less costly refrigeration system 

Project Implementation Method

Project is implemented by the expansion of high pressure LPg into low pressure and thus it,s momentum increases and then it is carried to the evaporator for cooling purpose

Benefits of the Project

This projects has benefits in industries which uses LpG as high demand.This is by product which is obtained by the use of LpG when it is used for cooking or other purposes.Can also be used in large restaurants where continuously cooking is required by the use of LpG

Technical Details of Final Deliverable

We use LPg cyclinder which is mostly used in houses and restaurants. We also use a capilliary as a throttling device and then evaporator where cooling takes place and a burner or generator for the use of low pressure LpG 

Final Deliverable of the Project

Hardware System

Core Industry

Others

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
LPG cylinder Equipment135003500
Capillary Miscellaneous 150005000
Evaporator Miscellaneous 130003000
high pressure pipes Equipment220004000
pressure gauges Equipment210002000
Total in (Rs) 17500
If you need this project, please contact me on contact@adikhanofficial.com
Publishers Paramount

Journal management is a difficult and time-consuming operation, especially if no automatio...

1675638330.png
Adil Khan
10 months ago
Facial based security entrance system

To design a system that can detect or recognised student faces in real time . Project Ob...

1675638330.png
Adil Khan
10 months ago
Paktour app

Our project is a web and mobile application platform for the tourists who wants to travel...

1675638330.png
Adil Khan
10 months ago
EEG Based Human Emotion Recognition using Deep Learning

Since there are differently abled people everywhere. It is crucial to make them feel inclu...

1675638330.png
Adil Khan
10 months ago
Portable cost effective hybrid power plant Using Renewable Energy Sour...

Domestic sector of Pakistan profoundly leans on grid electricity, generated by fossil fuel...

1675638330.png
Adil Khan
10 months ago