Project Summary: The purpose of the project is to develop an assessment tool for the procurement of Electric Vehicles' parts in Pakistan with a minimum risk of scam/fraud. Knowledge discovery and quality control management technique helps inspect the
Knowledge Discovery for Procurement of Electric Vehicles' Parts in Pakistan
Project Summary:
The purpose of the project is to develop an assessment tool for the procurement of Electric Vehicles' parts in Pakistan with a minimum risk of scam/fraud. Knowledge discovery and quality control management technique helps inspect the quality of EV products and grade every international EV vendor based on performance. This initiative helps filter out the dealers who can deliver quality EV products. The tool for assessment of suppliers/vendors can ultimately also help a common man import spare parts of EVs safely without facing any fraud/scam.
The Objectives of the Project include:
The focus of methodology is primarily on knowledge discovery from the data available to help Pakistan’s automobile dealers make procurement decisions.
(1) Comprehending the Desired Goals:
Initially, the research is executed to determine the intended goals of Knowledge Discovery regarding authentic international suppliers for EV parts. To fulfil the objective, a thorough analysis of global research papers is carried out to find the availability and supply of EVs and their parts worldwide.
(2) Gathering Target Data:
The certified assessment reports, available online, of vendors/suppliers that provide EV parts to customers are analyzed for data collection. The criteria to evaluate supplier performance are chosen based on knowledge of the hypothesis and design of research.
(3) Pre-Processing and Mining:
Data Pre-Processing techniques are employed to complete the missing points, even noisy data and eliminate inconsistencies.
(4) Model Building:
The research under consideration uses algorithms, for example, JRIP (ripple), PART and J48 (decision tree) to construct diverse models by employing a data mining tool such as WEKA.
(5) Evaluation and Interpretation of Mined Data:
Several patterns concerning a vendor’s grades are analyzed. The outputs are improved by changing the algorithms' features and afterwards run their interpretation to assess the data on the supplier of EV parts.
(6) Development of Assessment Tool
The research integrates the knowledge into the performance system to develop an assessment tool to check an EV vendor's reliability.
The Benefits of the Project Include:
To develop a Generic Assessment Tool for convenient evaluation of EV vendors for a common man in Pakistan in the light of the recent Government of Pakistan's policy concerning EVs and their parts.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Online Paid Subscriptions | Equipment | 6 | 5000 | 30000 |
| High Speed Internet | Equipment | 12 | 1500 | 18000 |
| Online Library Database | Equipment | 4 | 5500 | 22000 |
| Prints and Stationary | Miscellaneous | 3 | 3333 | 9999 |
| Total in (Rs) | 79999 |
To convert energy from renewable sources (in the form of DC power) to some useful form (in...
Firefighting has long been a dangerous field with fire fighter?s life as well as other liv...
The term ?Irrigation System? is mainly a way to give water to the crops. In the field of a...
Suicidal attacks are becoming common spreading terror regarding veil. There are many cases...
The vision is to create an online auction app where items can be put up for auction and th...