INSTINCTIVE DESIGN CONTROL FOR PAD VETTING USING AI

Project Summary: There are a lot of industries in Pakistan which produces goods in large quantities for their customers, these goods must be in good shape before arriving at consumers door steps. There must be no cutting, discoloration, deformity, over excessive

2025-06-28 16:27:49 - Adil Khan

Project Title

INSTINCTIVE DESIGN CONTROL FOR PAD VETTING USING AI

Project Area of Specialization Artificial IntelligenceProject Summary

Project Summary:

There are a lot of industries in Pakistan which produces goods in large quantities for their customers, these goods must be in good shape before arriving at consumers door steps. There must be no cutting, discoloration, deformity, over excessive product attached to it or the company image would be damaged. In order to avoid that companies hire workers to detect and remove these errors, which increase the cost on both manufacturer and consumer side.
According to PwC, 59 percent of consumers who love a product or brand would ditch it after several poor experiences. More concerningly, almost one in five would do so after a single bad experience.

In order to solve this pressing problem we making an Intelligence machine which would fit in almost every industry and help manufacturer to deliver good quality product to the customer in less time. Our Project is AI based machine which can differentiate between good and bad (defected) products, sort different products, discard damaged product and then then register every batch of product, these registered data can then be transferred to the data base. 

Project Objectives

Project Objectives:

Our main objective is to equip industries with a tool to increase the quality of the product, which in return decrees time, improve quality and increase the profit by gaining costumer confident. all this in a more user friendly method

Project Implementation Method

Project Implementation Method:

We will implement our project through waterfall model. Phases of implemented method
as follows:

1. Requirement gathering and Analysis: All possible requirements of the system to be
developed are captured in this phase and documented in a requirement specification
document.


2. System Design: The requirement specifications from first phase are studied in this
phase and the system design is prepared. This system design helps in specifying
hardware and system requirements and helps in defining the overall system
architecture.

3. Coding / Implementation: With inputs from the system design, the system is first
developed in small programs called units, which are integrated in the next phase. Each
unit is developed and tested for its functionality, which is referred to as Unit Testing.
 

4. Integration and Testing: All the units developed in the implementation phase are
integrated into a system after testing of each unit. Post integration the entire system is
tested for any faults and failures.


5. Deployment of system: Once the functional and non-functional testing is done; the
product is deployed in the live environment.

Benefits of the Project

Benefits of the Project:

. Increase in Efficiency

. Good product quality

. Satisfied coustomer

. Save time

. User Friendly

Technical Details of Final Deliverable

Technical Details of Final Deliverable:

Final Deliverable of the Project HW/SW integrated systemCore Industry ManufacturingOther Industries Medical , Food , Others Core Technology Artificial Intelligence(AI)Other Technologies Shared Economy, Big DataSustainable Development Goals Decent Work and Economic Growth, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 44400
Camera(Pi camera V2/ESP32 Can) Equipment172007200
LCD display(16*4) Equipment1750750
Power Button Equipment1120120
I2C Equipment1200200
Survo Equipment46002400
Motor Equipment225005000
Motor Driver Equipment2200400
Power supply Equipment1500500
Arduino Uno Equipment220004000
Boost Converter Equipment1230230
IR Sensors Equipment6100600
convayer belt Equipment11500015000
Wires and other components Equipment110001000
Report/Documentation Miscellaneous 0100000
Nais PLC 8AI Equipment170007000
Nais PLC Cable Miscellaneous 010000