Hybrid Energy System for lightning loads of ship

Hybrid electric system of lightning loads for ships Description:  Our Final Year Project is proposed in order to overcome the power generation issues in ships. We implied an idea to use renewable resources (Wind,tidal and Solar) energies in order to generate power rather than traditiona

2025-06-28 16:32:59 - Adil Khan

Project Title

Hybrid Energy System for lightning loads of ship

Project Area of Specialization Shared EconomyProject Summary

Hybrid electric system of lightning loads for ships

Description:  Our Final Year Project is proposed in order to overcome the power generation issues in ships. We implied an idea to use renewable resources (Wind,tidal and Solar) energies in order to generate power rather than traditionally using Diesel generator, steam generators and Crude oil. This idea will be helpful to reduce environmental pollution and minimize the cost of generators.

Project Objectives

This plant takes yearly maintanes.

Project Implementation Method

It is certified that the FYP titled “Hybrid power system for lightning loads of ship” has been approved and is being undertaken by the above mentioned students as their Final Year Project.

It is undertaken that the undersigned has understood and accepted the “terms & conditions” of the program, attached with this form and further reiterate that, if the subject FYP is approved, the reimbursement of Funds claimed through Expenditure Report shall be in accordance with the “terms & conditions” of the Program and the undersigned will be liable to return the unutilized amount and other cost not approved by the Ignite-National Technology Fund, if any.

It is further undertaken that Expenditure Report of approved FYPs shall be furnished along with the supporting documents as devised in attached Terms and Conditions of the Program and other required deliverables as and when required by Ignite.

Benefits of the Project

These plant can be installed

Technical Details of Final Deliverable

It is stabilized so that its flight take-off and landing done easily.

Final Deliverable of the Project Hardware SystemType of Industry Energy Technologies OthersSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 67000
Brushless DC motor Equipment420008000
Electronic speed control Equipment812009600
Frame of ship Miscellaneous 11000010000
Micro Controller and other modules Equipment140004000
Circuits and there devices Equipment11200012000
Solar plates Equipment180008000
Batteries Equipment217003400
Propellers for wind and tidal Equipment2600012000