Since wind is a good source of generating electricity through wind turbine but wind is not available 24/7 therefore we are designing a circuit that will overcome this issue. Sometimes wind is excessively available which generates abnormal power than usual therefore our aim is to maintain pow
Fully Rated converter wind turbine
Since wind is a good source of generating electricity through wind turbine but wind is not available 24/7 therefore we are designing a circuit that will overcome this issue.
Sometimes wind is excessively available which generates abnormal power than usual therefore our aim is to maintain power on the output side through feedback mechanism.
we will be maintaining power through our project.
our objective is to generate and maintain desired power.
since project is under process therefore we can not expect its implementation at the moment.
since it is a research project therefore it may require time as well as money
project is benefitial for homes as well as industries.
n/a
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| STK5C4U332J-E | Miscellaneous | 4 | 2000 | 8000 |
| 3 phase panel | Equipment | 1 | 4000 | 4000 |
| single phase panel | Equipment | 1 | 2500 | 2500 |
| stand | Miscellaneous | 1 | 800 | 800 |
| chemicals,components | Miscellaneous | 1 | 200 | 200 |
| pcb | Equipment | 1 | 5000 | 5000 |
| bulb, wires | Equipment | 1 | 1500 | 1500 |
| Total in (Rs) | 22000 |
Now a day?s education plays a great role in development of any country. Many of education...
The studies on the photovoltaic (PV) generation are extensively increasing because it is p...
The Vision, a glasses mounted with camera and sensors use artificial intelligen...
People with lower limb muscular disorder unable to move their leg which affects their qual...