Energy Audit for Industrial and Residential sectors

Energy audit is a process that helps you to identify where your energy is losing  and what steps you can take to improve energy efficiency. An  energy audit is something that every homeowner/industrialist should be doing every two to three years in order

Project Title

Energy Audit for Industrial and Residential sectors

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Energy audit is a process that helps you to identify where your energy is losing  and what steps you can take to improve energy efficiency. An  energy audit is something that every homeowner/industrialist should be doing every two to three years in order to ensure maximum efficiency and spending.In any Industrial and residential area the only easiest way of saving expenses are found to be energy. In the recent years Pakistan has been facing an increase in energy demand due to its large population and tremendous increase of industrial sector electricity requirement. To improve national growth and to reduce the increasing energy demand, introducing PV (photovoltaic) system which reducing energy consumption is the best option and also helps in decreasing energy costs. The largest consumption in residential, industries and workshops from all available energy consuming sectors. Preliminary audit we first do to reduce the energy consumption. All the lighting data of the buildings were collected and an energy audit was conducted with the idea of introducing new system to reduce the energy consumption. The main scope of this energy audit is based on the idea of effective energy conservation in buildings. In this project we work on the residential and industrial consumption devices and reduce energy through different methodology.

Project Objectives

The thought behind conducting the audit is to:
1.Develop standards for all energy consuming appliances and introduce practice of investigating these standards.

2.Promote the culture of energy conservation and energy independence..

3.Set procedures that make it mandatory for builders to get an energy conservation audit done beforehand.

4.Encourage peoples to opt for “retrofitting public buildings

5.Promote the concept of Green Building and construct a complete Green Building.


 

Project Implementation Method

Step by Step Procedure of Work:-

The steps for conducting the energy audit are as follows:-

Preliminary Walk?Through Survey:-

The first step for carrying out a detailed energy analysis is to conduct a walk?through survey which will require  to visit the facility and analyze the existing situation of energy consumption, number of rooms, the type of load being run and the equipment being used at the facility. The team will have the following checklist against which observations will be made:-

Checklist:-

  • Analysis and electrical quantification of existing equipment.
  • Duly filling of appliance quantification form against which the wattage of each appliance will be noted.
  • Select the different catagories of load for example Lighting,fan,electronic load etc.
  • Calculate the enerrgy consumption of existing catagory with the help of sanction load.
  • Find  the scope of the retrofitting and energy conservation.

Detailed Energy Survey:-

On the basis of the prliminary walk through which give us the current existing energy in building or sector.Base upon this data we perform detail energy survey.


LOAD MEASURMENT AND ANALYSIS DEVICES:-

  • Hand held Power Analyzer

LUX Meter:-



 

Benefits of the Project

Energy audit has enormous benefits which are followings

  1. It helps to mitigate energy cost in our facilities.
  2. As the industry point  if we reduce the production cost compititeness of industry will improve.
  3. It helps us to reduce the enviromental pollution and damage.
  4. It increases the security of our energy.
  5. It reduces the consumption of our resources.
  6. It can reduce the damage to enviroment due to consumption of natural resources.
  7. It can reduce the immpact of GHG(Green House Gas).

At particular levels it has some of the major benefits of energy audit.

  • It helps to lower the energy bills.
  • It enables us to increase the comfort of the facility.
  • It helps if any type of unaccounted device  exist in our facility.

In summary, energy audit helps us to identify the existing energy aand consumption and it envolve to do meaure to maximize the load and efficiency.

Energy efficiency effect the three main factors

  • Profitability, throught the enegy efficiency
  • Productivity,through the  optimiztion of equipment process
  • Performancce,thanks to rationalization use.

Technical Details of Final Deliverable

It'll be in the form of  both report and hardware.For example at the end of the project we will  do following work

Timer circuit:-

Timer circuit which will enable us to  ON/Off the device through application which we have in our mobile.For example our geyser in university ON for 24 hour if we run it for 10 hours because 14 hours our geyser haven't used.Following calculations explain  this scenario.

DOU of geysers are 180 days and 24 hours. If we operate geysers for 10 hours per day with timers circuit we can save following amount of money annually

Name of
Appliances
Quantity Hours of Operation Annul
WAPDA
(kWh)
Total
Energy Cost
(PKR)
Annual
savings kWh
Annual
Savings
(PKR)
Geysers(1800W) 4 *Time of Use And
**DOU
31104 576668 18144 240278

2.Automatic room light controller

For example in many houses,institutions and industries people don't care for ON/OFF of lights.So through this device we are going to reduce the extra hours of lighting consumption.

On of the best deliverable of our project as followings.

RECOMMENDATIONS:-

  • Lighting

We have done the audit of our university B hostel.Through this audit we give following recommendations to our university admin.

  • Fans:-

We give following recommendation  to our university admin regardding  to fans

SOLAR PANEL CALCULATIONS:-

We have  done following calculations for our hostel

Name of
Appliances

Geysers(1800W)

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Core Technology

Clean Tech

Other Technologies

Internet of Things (IoT)

Sustainable Development Goals

Affordable and Clean Energy, Responsible Consumption and Production, Climate Action

Required Resources

Elapsed time in (days or weeks or month or quarter) since start of the project Milestone Deliverable
Month 1synopsisyes
Month 2Programming of timer circuityes
Month 3Hardware of timer circuit and connect with heavy devices like geysersyes
Month 4Preliminary walk through and detail energy audit of residential sectoryes
Month 5Lux analysis and retrofitting recommendations of residential sector(It's mean complete energy audit of any residential sectors)yes
Month 6Energy Audit of industrial sectors and take remuneration from that companyIP(In process)
Month 7programming of Automatic on/off of Lights and hardwareIP(In process)
Month 8Internship in any energy audit company and strive for job in that industry if possibleIP(In process)
Month 9Report of FYP and convert our project into businessIP(In process)
If you need this project, please contact me on contact@adikhanofficial.com
IOT based Pill Bottle

Internet of things is the network connecting between the devices which contain electronics...

1675638330.png
Adil Khan
9 months ago
emotion detection using speech recognition

Emotion Detection using Speech Recognition was a technology that extract emotional feature...

1675638330.png
Adil Khan
9 months ago
Solar System metering using wireless control Network

NET METERING constitutes significant economic incentives for customers who use DERs to pro...

1675638330.png
Adil Khan
9 months ago
Number Plate Recognition System

Our Product Is Car Number Plate Recognition System and this will be the first release of o...

1675638330.png
Adil Khan
9 months ago
Design and Development of Lab experimental model of 3 Degrees of freed...

The project undertaken is the design and development of three-degree of freedom hinged qua...

1675638330.png
Adil Khan
9 months ago