Digital Resource Locate System

The project is to automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.

2025-06-28 16:32:09 - Adil Khan

Project Title

Digital Resource Locate System

Project Area of Specialization Internet of ThingsProject Summary

The project is to automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.

Project roles and resources will have been identified as part of the planning, estimating and resourcing process. Note that the resources and optimum way of working will normally change during the project. Often an initial high-powered team will define the business solution, followed by a much broader team to deliver it, and then a line management and operational team to operate it. The will be a core team who remain fully involved throughout the project, but others will need to be brought in as required.

Project Objectives

System objective is to automate the digital labs or digital libraries for the maximum utilization of computer resources which implies to reduce paper work and better utility of resource and time. In today’s modern world all the work is down in computer. The project digital resource locator has been developed for the purpose of maintaining records in organized and proper way.

Project Implementation Method

The workin proceedure automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.

Project roles and resources will have been identified as part of the planning, estimating and resourcing process. Note that the resources and optimum way of working will normally change during the project. Often an initial high-powered team will define the business solution, followed by a much broader team to deliver it, and then a line management and operational team to operate it. The will be a core team who remain fully involved throughout the project, but others will need to be brought in as required.

Benefits of the Project Technical Details of Final Deliverable

Hardware Configuration

Software Configuration

Testing

Debugging

Integeration

Final Deliverable of the Project HW/SW integrated systemType of Industry IT Technologies Internet of Things (IoT)Sustainable Development Goals Quality EducationRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 30000
Currency Recognize Machine Equipment12500025000
Card Reader Machine Equipment150005000

More Posts