Digital Resource Locate System
The project is to automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.
2025-06-28 16:32:09 - Adil Khan
Digital Resource Locate System
Project Area of Specialization Internet of ThingsProject SummaryThe project is to automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.
Project roles and resources will have been identified as part of the planning, estimating and resourcing process. Note that the resources and optimum way of working will normally change during the project. Often an initial high-powered team will define the business solution, followed by a much broader team to deliver it, and then a line management and operational team to operate it. The will be a core team who remain fully involved throughout the project, but others will need to be brought in as required.
Project ObjectivesSystem objective is to automate the digital labs or digital libraries for the maximum utilization of computer resources which implies to reduce paper work and better utility of resource and time. In today’s modern world all the work is down in computer. The project digital resource locator has been developed for the purpose of maintaining records in organized and proper way.
Project Implementation MethodThe workin proceedure automate the digital labs for the maximum utilization of computer resources in computer labs or digital libraries. The system helps to locate the system details and allot time period to the user according to the user requirement and report generation is performed easily by admin.
Project roles and resources will have been identified as part of the planning, estimating and resourcing process. Note that the resources and optimum way of working will normally change during the project. Often an initial high-powered team will define the business solution, followed by a much broader team to deliver it, and then a line management and operational team to operate it. The will be a core team who remain fully involved throughout the project, but others will need to be brought in as required.
Benefits of the Project- Manual reporting
- Minimum computer resources
- Maximum utilization of computer recourses in limited time
- Human or student Error
- Workload and Stress.
- Check to make sure that all students’ accounts are active; be aware of any students who may have restricted access for some reason.
- Know the process that students use to log in to the network.
- Remind students of their responsibilities established through the school’s Acceptable Use Policy.
- Establish any additional classroom rules for your class when using the computer lab.
- Define and identify inappropriate behavior and use of equipment before and during lab time.
- Identify consequences for violating any rules and enforce them.
- Test the lesson ahead of time to anticipate questions and problems. If possible, have students meet in their regular classroom for attendance and last-minute instructions before going to the computer lab.
- Assign students to specific computers, possibly the same computer in the lab throughout the year (unless special groups are working together for a project).
Hardware Configuration
Software Configuration
Testing
Debugging
Integeration
Final Deliverable of the Project HW/SW integrated systemType of Industry IT Technologies Internet of Things (IoT)Sustainable Development Goals Quality EducationRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 30000 | |||
| Currency Recognize Machine | Equipment | 1 | 25000 | 25000 |
| Card Reader Machine | Equipment | 1 | 5000 | 5000 |