Design and Simulation of Alternate Positioning and Navigation Timing System for Aircraft
The inherent susceptibility of GNSS systems makes them highly inadequate for Mission Critical or Safety Critical applications. Both DARPA and FAA are funding research programs for terrestrial APNT systems. This project aims to align our students with contemporary research in Avionics. The main reaso
2025-06-28 16:26:25 - Adil Khan
Design and Simulation of Alternate Positioning and Navigation Timing System for Aircraft
Project Area of Specialization Information & Communication TechnologyProject SummaryThe inherent susceptibility of GNSS systems makes them highly inadequate for Mission Critical or Safety Critical applications. Both DARPA and FAA are funding research programs for terrestrial APNT systems. This project aims to align our students with contemporary research in Avionics. The main reason for this project is that the signals received from the GNSS are very weak to further process in accordance with the standard time.The project aims to design and simulate an APNT system covering Pakistan that can be used both by manned aircraft and UAVs. There would be 6-8 transmitters used to cover the whole area of Pakistan without any sort of interference.
Project ObjectivesThe system shall demonstrate:
Geographical and Spatial Coverage
Spectrum utilization
Signal Protocols
Required Navigational Accuracy through Mathematical Modeling
Project Implementation Methoda) TransmitterĀ Specifications and Simulation
b) Geographical and Spatial Coverage Models
c) Navigational Algorithms
d) Required Navigation Performance
Benefits of the ProjectThe APNT isĀ fail-safe to GNSS and can be use in the absence of GNSS. It's implementation is simple.
Technical Details of Final DeliverableBasic Navigation using verified VOR-DME
Using Kalman FIlter Navigational Accuracy
Geographical Mapping
Final Deliverable of the Project Software SystemCore Industry TelecommunicationOther Industries Others Core Technology Shared EconomyOther Technologies OthersSustainable Development Goals Decent Work and Economic Growth, Partnerships to achieve the GoalRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 9500 | |||
| Printing | Miscellaneous | 1 | 9500 | 9500 |