Design and Implementation of Smart Wireless Fire Tender Based on IOT Technology

We will implemented a Fire fighting robot using deep learning technology and machine vision on the Raspberry Pi 4 (4GB) platform. we found that a combination of Alex net and ImageNet is useful for achieving an accuracy of 98.25 % and 92 % respectively. For transfer learning purposes, we preferred us

Project Title

Design and Implementation of Smart Wireless Fire Tender Based on IOT Technology

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

We will implemented a Fire fighting robot using deep learning technology and machine vision on the Raspberry Pi 4 (4GB) platform. we found that a combination of Alex net and ImageNet is useful for achieving an accuracy of 98.25 % and 92 % respectively. For transfer learning purposes, we preferred using high-end computers, and to run a live image processing with pre-trained networks Raspberry pi 4 was capable enough. We assume that this could be the starting point of innovative deep learning technologies in the field of fire fighting and similar applications where human life can be saved

Project Objectives

Our project “IOT Based Fire Tender” to enhance Fire Fighter skills and Safety for our Fire Fighters.

Project Implementation Method

We have inspected the project site and clearly understood the scope of work and specification. It is clearly understood that the site will be made available to us for the scope on ‘as is where is basis’. We have obtained all necessary information as to risks, contingencies and other circumstances which may influence or affect the tender.

The rates quoted shall be valid for working at all heights, depths and on all floor levels. No extra payment shall be made for scaffolding, staging, ladders, etc., for transportation of men and material at higher or lower levels.

In our scope we have considered arranging and maintaining at our own cost all materials, tools & plants, water, electricity access, facilities for workers and all other services required for executing the work unless otherwise specifically provided for in the contract documents. All demolition works, preparation of surface etc if required to be carried out at site for fulfillment of the scope of this tender has been included in our quoted rates.

The Contractor shall submit Interim Bills with detailed joint measurements to the Engineer in Charge, in a format agreed with the Engineer in Charge. The Bills so submitted shall be supported by detailed measurement sheets for the work carried out and by reconciliation statements for the consumption of owner supplied materials if any. Measurements shall be in accordance with the approved drawings and as per the joint measurement records.

All interim payments shall be regarded as payment by way of advances against final payment only and not as payments for work actually done and completed and/or accepted by the Employer and shall not preclude the requiring of bad, unsound and imperfect or unskilled work to be rejected, removed, taken away and reconstructed or re-erected be considered as an admission of the due performance of the Contract, or any part thereof, in this respect, or the accruing of any claim.

Adequate protections against any form of damage or deterioration shall be provided for in all sections of the Works. These shall include protective tapes, casings, guard rails and the likes, which shall be provided if necessary. Particular care shall be taken to self finished surfaces during the application of adjacent in situ work. The Contractor shall carry out all steps taken in pursuance of this clause, as directed and instructed by the Engineer-in-Charge. The existing floor shall be given due protection by means of tarpaulin sheets. All the existing fittings and fixtures shall be handed over to the Employer and acknowledgement taken thereof. The contractor shall ensure that during the course of the work any damage caused to the work area or outside the work area to any portion of the structure shall be restored to its original condition complete with finishes to the satisfaction of the Employer.

Benefits of the Project

The benefit of this project is to increase the safety of emergency responders and building occupants by providing information about how firefighters typically interact with building features and fire protection systems during fires  and similar emergencies. By better understanding the needs of the fire service, designers and code officials can work together to streamline fire service emergency operations within the built environment.

The combined efforts of designers, code officials, and related stakeholders can result in safer workplaces for firefighters. When designs are tailored to better meet emergency service operational needs, the time and complexity needed to mitigate an incident is often reduced. Designers in this manual can include architects, engineers, planners, and design technicians. Code officials can include fire marshals, fire inspectors, fire prevention officers, building inspectors, and plan reviewers. Other stakeholders include building owners and developers, security professionals, and construction professionals.

We confirm that we will be solely responsible for safe working conditions at site and shall take all safety measures to protect men, material, machine and property etc. and will not damage any living or living element through any unsafe

The building code responsibility for firefighter protection applies equally to prescriptive and performance-based design. However, a higher level of knowledge regarding fire service operations would likely be needed to meet this responsibility in a performancebased design scenario. Only with a thorough understanding of how the fire service interacts with all building features and systems during an emergency can a designer evaluate and ensure the safety of firefighters. Many portions of the prescriptive codes and standards governing buildings and fire protection systems allow for design variations. The resulting flexibility permits the selection of a variety of design options. This manual discusses how the fire service interacts with different building features to help designers select options that may streamline fire service operations.

It is also a term of this contract that recording/ checking of measurements of any item of work in the measurement book and/or its payment in the interim, on account or final bill shall not be considered as conclusive evidence as to the sufficiency of any work or material to which it relates nor shall it relieve the contractor from liabilities from any over measurement or defects noticed till Completion of the defects liability period.

Technical Details of Final Deliverable

The Fire Tender shall be fabricated with the best material and good workmanship, ensuring effective and efficient operation of the Tender. The Water Tanks shall be so installed as to allow the full flow of water to the pump. The tank shall have baffle plates in order to avoid surge when the vehicle is braking, accelerating and cornering. An inspection manhole shall be provided on top of the tank. The manhole shall have a hinged cover so that the manhole shall also act as a filling orifice. Cover shall be marked with the word “WATER”.

Suitable eyes shall be provided on the shell of the tank to enable it to be lifted off the vehicle for repairs when required. A cleaning hole shall be provided at the bottom of the tank. It shall be fitted with a drain pipe & valve which shall be taken down to a point well below the chassis without reducing the effective ground clearance. The tank shall be fitted with an overflow pipe taken down to a point well below the chassis that discharges the water away from the wheels. Hydrant connection incorporating a strainer shall be provided for filling the tank. A pipeline shall be taken from the tank to the suction inlet of the pump incorporating a quick action butterfly valve. The tank shall be connected with the pump in such a manner that pressurization of water tank or water tank  pump connection is avoided when pumping water from an outside source of supply.

The rates have been quoted based on the assumption that drawings, general and technical specifications, description of work are complimentary to each other. Any work specified in the general specifications or Description of work but not included in the drawing shall be executed without any extra cost. The work specified in the drawing but not explicitly mentioned in the scope and general specifications shall also be executed without any extra cost.

n the works and provide all labour and materials, tools and plants including for measurements and supervision of all works, and other things of temporary or permanent nature required for such execution and maintenance in so far as the necessity for providing these, is specified or is reasonably inferred from the contract. The Contractor shall take full responsibility for adequacy, suitability and safety of all the works and methods of construction

Final Deliverable of the Project

Hardware System

Core Industry

Security

Other Industries

Others

Core Technology

Artificial Intelligence(AI)

Other Technologies

Robotics

Sustainable Development Goals

Industry, Innovation and Infrastructure, Climate Action

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Raspberry pie Equipment13300033000
Arduino Equipment130003000
Platform, Bolts, screws, washer, nuts etc Equipment180008000
MS/SS frame for design Equipment150005000
4 rotter double loaded gear Motors Equipment11000010000
12V power supply with lithium battery Equipment110001000
Rollers + Sprockets + chain belt + Bearing Equipment170007000
Wires, tubs, connectors, switch buttons etc Equipment130003000
Fire Extinguishers with auto magnetic pressure valve Miscellaneous 140004000
4 Designated controllers for platform motors + 4 micro controller Miscellaneous 160006000
Total in (Rs) 80000
If you need this project, please contact me on contact@adikhanofficial.com
Drug designing

Drug resistance is an international issue, right now antibiotic resistant pathogens kills...

1675638330.png
Adil Khan
11 months ago
FPGA Based Stock Market Data Feed Handler

Stock Market is one of the most important pivots of countries economy. For the growth...

1675638330.png
Adil Khan
11 months ago
Hybrid Solar WAPDA Irrigation System

Pakistan is primarily an agriculture country with the capability of producing wheat, cotto...

1675638330.png
Adil Khan
11 months ago
Automatic Robotic Vehicle Paint Thickness Tester

Automatic robotic paint tester is a device, having main components as Robotic 4R ARM and p...

1675638330.png
Adil Khan
11 months ago
Automated Fortification and Smart Monitoring of Distribution Transform...

Distribution Transformers (DTs) are essential part of WAPDA's distribution system.The...

1675638330.png
Adil Khan
11 months ago