Controlling thickness of chromium plating in hard chromium plating plant

This project is a linear control system of an electro-chemical system in which we were trying to control the thickness of the metal plated on the surface of another metal. in specific we were trying to control thickness of chrome metal specifically.

2025-06-28 16:25:59 - Adil Khan

Project Title

Controlling thickness of chromium plating in hard chromium plating plant

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

This project is a linear control system of an electro-chemical system in which we were trying to control the thickness of the metal plated on the surface of another metal. in specific we were trying to control thickness of chrome metal specifically.

Project Objectives

Our objective is to upgrade a chromium plant so then we could achieve our desire thickness of chrome. we were automizing the manual system so after our upgradation the system will turn ON and OFF automatically.

Project Implementation Method

we were using a time controller for our project. In this controller we have a specific time interval, specific gravity of electrolyte and current to achieve a specific thickness. With controlling these parameters, we will control the thickness of chrome

Benefits of the Project

This project will be beneficial for industries in many ways, some of them were mention bellow

1.Artifical Intelligent:

This system will be artificially intelligent as it can turn ON and OFF automatically, the technician will just enter the value he wants plate on metal and ten leave the system, the system will turn OFF automatically after achieving the value of thickness entered in start

2.Reduce labor cost:

This will also reduce the labor cost as we know previously everything is manual so in a manual system more labor is required because the need to monitor system each second the system is running while in automatic system this factor is reduced.

3.Error ratio:

As the new system is an intelligent system so the error with compare to manual will be negligible.

Technical Details of Final Deliverable

Hardware prototype and simulink model

Final Deliverable of the Project HW/SW integrated systemCore Industry ManufacturingOther Industries Transportation , Others Core Technology Artificial Intelligence(AI)Other Technologies OthersSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 57950
arduino uno r3 Equipment318005400
LCD 16*3 Equipment2380760
current sensor Equipment6230013800
PCB sheet Equipment417006800
fecl3 Equipment39002700
solder wire Equipment2320640
soldering iron Equipment112501250
current controlled circuit Equipment11760017600
capacitor , resistor etc Miscellaneous 190009000

More Posts