Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

capacity analysis of pof

Following is the procedure developed by Mikell Groover for a direct time study: Define and document the standard method. Divide the task into work elements. These first two steps are conducted prior to the actual timing. They familiarize the analyst with the task and all

Project Title

capacity analysis of pof

Project Area of Specialization

Mechanical Engineering

Project Summary

Our aim is to Carryout capacity measurement of clothing factory,identify possible weak areas and suggest remedial measures to increase productivity 

Time study procedure

Following is the procedure developed by Mikell Groover for a direct time study:

  1. Define and document the standard method.
  2. Divide the task into work elements.

    These first two steps are conducted prior to the actual timing. They familiarize the analyst with the task and allow the analyst to attempt to improve the work procedure before defining the standard time.

  3. Time the work elements to obtain the observed time for the task.
  4. Evaluate the worker's pace relative to standard performance (performance rating), to determine the normal time.

    Note that steps 3 and 4 are accomplished simultaneously. During these steps, several different work cycles are timed, and each cycle performance is rated independently. Finally, the values collected at these steps are averaged to get the normalized time.

  5. Apply an allowance to the normal time to compute the standard time. The allowance factors that are needed in the work are then added to compute the standard time for the task.

Project Objectives

Our aim is to Carryout capacity measurement of clothing factory,identify possible weak areas and suggest remedial measures to increase productivity 

Project Implementation Method

By using stopwatch method to calculate and determine work measurement 

Benefits of the Project

The increase in productivity and efficiency of the industry.

Technical Details of Final Deliverable

External observer: Someone visually follows the person being observed, either contemporaneously or via video recording. This method presents additional expense as it usually requires a 1 to 1 ratio of research time to subject time. An advantage is the data can be more consistent, complete, and accurate than with self-reporting.Self-reporting: Self-reported studies require the target to record time and activity data. This can be done contemporaneously by having subjects stop and start a timer when completing a task, through work sampling where the subject records what they are doing at determined or random intervals, or by having the subject journal activities at the end of the day. Self-reporting introduces errors that may not be present through other methods, including errors in temporal perception and memory, as well as the motivation to manipulate the data.Automation: Motion can be tracked with GPS. Documentation activities can be tracked through monitoring software embedded in the applications used to create documentation. Badge scans can also create a log of activity

Final Deliverable of the Project

Software System

Core Industry

Manufacturing

Other Industries

Core Technology

Wearables and Implantables

Other Technologies

Sustainable Development Goals

Decent Work and Economic Growth

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
pof clothing factory Miscellaneous 11000010000
Total in (Rs) 10000
If you need this project, please contact me on contact@adikhanofficial.com
0
187
Smart Parking System

Smart parking system, it provides slots for reservation and shows that which slots are fr...

1675638330.png
Adil Khan
1 year ago
Design and development of Teleoperation System

The sense of touch conveys rich and detailed information about an object. When it's combin...

1675638330.png
Adil Khan
1 year ago
Instrumentation of Hybrid Rocket Motor Test Bed

Although propulsion is a mature subject, one technique has recently sparked a lot of resea...

1675638330.png
Adil Khan
1 year ago
CLASS SCHEDULE MANAGEMENT SYSTEM

Management and students face a variety of difficulties in most educational institutions, s...

1675638330.png
Adil Khan
1 year ago
Smart Traffic Management System

A large number of vehicles are causing slower speed which increases the trip time and incr...

1675638330.png
Adil Khan
1 year ago