Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Automation of Handlooms Shuttle

The main concern for our project is to automate the weft thread mechanism of handloom. This can be done by placing two electromagnets (solenoid) that will generate an Electromotive force to move the wooden piece (shuttle) across the (? 4 feet) lay. Solenoid coil will be designed according to the

Project Title

Automation of Handlooms Shuttle

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

The main concern for our project is to automate the weft thread mechanism of handloom.
This can be done by placing two electromagnets (solenoid) that will generate an Electromotive force to move the wooden piece (shuttle) across the (? 4 feet) lay. Solenoid coil will be designed according to the weight of the shuttle i.e. the force required to move it and length of the lay.
Using sensors, we will be determining the position of shuttle on the lay. This mechanism can be fully automated using time delays but we will make it semi-automatic i.e. by using a push button.

Project Objectives

Automating handloom’s shuttle module to save time and increase productivity by reducing the manual work of beating shuttle.

Project Implementation Method

Employing hardware and PCB circuitry to automate the shuttle timing and motion that will make picking (insertion of shuttle between longitudinal threads) process less laborious.

Benefits of the Project

• To automate handloom’s shuttle in order to help the small scale textile industry of Pakistan.
• To reduce the work of beating the shuttle.
• To synchronize the timing of picking and shedding.

Technical Details of Final Deliverable

The previously hand operated shuttle picking in R&D lab of IST will now allow the shuttle to move across the (? 4 feet) lay, on the push of a button after sensing its current position.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Manufacturing

Other Industries

Core Technology

Wearables and Implantables

Other Technologies

Sustainable Development Goals

No Poverty, Good Health and Well-Being for People, Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Responsible Consumption and Production

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Mild Steel Rod Equipment245009000
Enamel Winding Wire Roll Equipment115001500
Cylindrical Bobbin Equipment450200
Microcontroller Equipment210002000
12V car's battery Equipment140004000
BreadBoard Equipment1200200
PCB Equipment210002000
Position Sensor Equipment4200800
Misc. Equipment103003000
Total in (Rs) 22700
If you need this project, please contact me on contact@adikhanofficial.com
0
303
Distributed Genetic Algorithm

Using Artificial intelligence our main purpose to find the best fit population for this pu...

1675638330.png
Adil Khan
1 year ago
IOT Heart Attack Detection & Heart Rate Monitor

These days a number of people are losing their life due to heart attack. Heart attack can...

1675638330.png
Adil Khan
1 year ago
Treating Anxiety In A School Setting

Anxiety disorders are among the most prevalent childhood psychological disorders. In addit...

1675638330.png
Adil Khan
1 year ago
AI based Acoustic System for Non Invasive Bone Fracture Diagnosis

Bone fracture is a discontinuity in the bone caused by applying force on it above its thre...

1675638330.png
Adil Khan
1 year ago
Overcoming overthinking in individuals

Overthinking is a state in which an individual has reoccurring negative thoughts which ult...

1675638330.png
Adil Khan
1 year ago