Automatic glass bangle flattening and weldong machine
In glass bangle industry the procedure of making bangles is maximum manual, we are making a product through which the flattening and welding part of the glass bangle will be done automatically. the main objective is to decrease the time and increase the quality of bangle as automated word will be mo
2025-06-28 16:30:26 - Adil Khan
Automatic glass bangle flattening and weldong machine
Project Area of Specialization RoboticsProject SummaryIn glass bangle industry the procedure of making bangles is maximum manual, we are making a product through which the flattening and welding part of the glass bangle will be done automatically. the main objective is to decrease the time and increase the quality of bangle as automated word will be more precise than work done by hand.
Project ObjectivesIn glass bangle industry the procedure of making bangles is maximum manual, we are making a product through which the flattening and welding part of the glass bangle will be done automatically. the main objective is to decrease the time and increase the quality of bangle as automated word will be more precise than work done by hand.
Project Implementation Methodwe will be designing a circular disk which will take raw bangle and then move to second cycle where bangle will be flattened and welded and in next step the finished welded and flattened bangle will come out.
Benefits of the Projectat present one bag of bangle containing 350 bangles labour gets 20 rs for flattening and more 20rs for welding but welding and flattening this much bangles consume lots of time and effort so we are designing a machine which will do this word automatically saving lots of time and effort of a person.
Technical Details of Final DeliverableIt will be completed before july and will be implemented from august in glass industry.
Final Deliverable of the Project Hardware SystemCore Industry ManufacturingOther Industries IT Core Technology RoboticsOther Technologies RoboticsSustainable Development Goals Decent Work and Economic Growth, Industry, Innovation and InfrastructureRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 54400 | |||
| Alluminium Sheets | Equipment | 2 | 2000 | 4000 |
| microcontroller | Equipment | 3 | 1800 | 5400 |
| motors | Equipment | 2 | 6000 | 12000 |
| Servo motors | Equipment | 15 | 1200 | 18000 |
| LPG Cylinder | Equipment | 2 | 5000 | 10000 |
| wires,burner,switches etc | Equipment | 1 | 5000 | 5000 |