App controlled realays at grid stations

We are going to resolve the burden issue on WAPDA by developing a system through automatic complaint will be registered to WAPA in case of cut down in supply or any other type of faul occurence in incoming power supply and the other difficulty was that maintenance team was working on their life rist

2025-06-28 16:30:16 - Adil Khan

Project Title

App controlled realays at grid stations

Project Area of Specialization Computer ScienceProject Summary

We are going to resolve the burden issue on WAPDA by developing a system through automatic complaint will be registered to WAPA in case of cut down in supply or any other type of faul occurence in incoming power supply and the other difficulty was that maintenance team was working on their life rist during the removal of fault. So to overcome the mentioned dufficulty we want to introduce smart grids in Pakistan that could br handled by the mobile application of the Lineman.

Project Objectives

1- Automatic complaint registration

2- Status could be viewed by the usersĀ 

3- Mobile Application to Handle the power supply of Grid

4- Smart City

5- Protection against electricity theft

Project Implementation Method

Agile Method

Benefits of the Project

1- minimum power loss

2- No queries will remain for complaint cell

3- Should be very easy to check the progress

4- Electricity theft will be reduced

5- lack of life risk for the maintainer

Technical Details of Final Deliverable

Smart Grid Controller

Final Deliverable of the Project HW/SW integrated systemCore Industry ITOther Industries Energy Core Technology Internet of Things (IoT)Other TechnologiesSustainable Development Goals Affordable and Clean EnergyRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 60000
Resberry pi Equipment31000030000
GSM Module Equipment31000030000

More Posts