We are going to resolve the burden issue on WAPDA by developing a system through automatic complaint will be registered to WAPA in case of cut down in supply or any other type of faul occurence in incoming power supply and the other difficulty was that maintenance team was working on their life rist
App controlled realays at grid stations
We are going to resolve the burden issue on WAPDA by developing a system through automatic complaint will be registered to WAPA in case of cut down in supply or any other type of faul occurence in incoming power supply and the other difficulty was that maintenance team was working on their life rist during the removal of fault. So to overcome the mentioned dufficulty we want to introduce smart grids in Pakistan that could br handled by the mobile application of the Lineman.
1- Automatic complaint registration
2- Status could be viewed by the users
3- Mobile Application to Handle the power supply of Grid
4- Smart City
5- Protection against electricity theft
Agile Method
1- minimum power loss
2- No queries will remain for complaint cell
3- Should be very easy to check the progress
4- Electricity theft will be reduced
5- lack of life risk for the maintainer
Smart Grid Controller
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Resberry pi | Equipment | 3 | 10000 | 30000 |
| GSM Module | Equipment | 3 | 10000 | 30000 |
| Total in (Rs) | 60000 |
In Pakistan numerous individuals just rely upon farming for their occupation. Prior farmin...
Traditional thermal cyclers are expensive and have a large size. One of the major contribu...
Solar Hybrid Power System is a multi-mode power system which can simultaneously manage inp...
The portable battery-powered hybrid (Solar + Electric) power tiller machine was the subjec...
In this project, the primary thought of sending power without utilizing wires. It is excep...